M/S Ma Engineering Solution

M/S Ma Engineering  Solution

Share

My products good quality and helpful

Photos from M/S Ma Engineering  Solution's post 18/01/2026

Ongoing installation works for Fire potackshon,Hayden System.

Call for your project: 88 01742-727218

Photos from M/S Ma Engineering  Solution's post 18/01/2026

Ongoing installation works for Fire Alarm and Detection System.

Call for your project: 88 01742-727218

Photos from M/S Ma Engineering  Solution's post 18/01/2026

Non UL Fire pump Room.1000 gpm

Photos from M/S Ma Engineering  Solution's post 11/01/2026

đŸ”Ĩ🚨 RSC āĻ…āĻĄāĻŋāϟ āϏāϤāĻ°ā§āĻ•āϤāĻž — Fire Sprinkler System āύ⧇āχ? āĻŦ⧜ āϰāĻŋāĻ¸ā§āĻ•! 🚨đŸ”Ĩ
āφāĻĒāύāĻžāϰ āĻĢā§āϝāĻžāĻ•ā§āϟāϰāĻŋāϤ⧇ Automatic Fire Sprinkler System āĻ•āĻŋ āϏāĻ¤ā§āϝāĻŋāχ RSC / BNBC āĻ…āύ⧁āϝāĻžā§Ÿā§€ āφāϛ⧇ āĻ“ āĻ•āĻžāϜ āĻ•āϰāϛ⧇?
❌ āύāĻž āĻĨāĻžāĻ•āϞ⧇ āĻ…āĻĄāĻŋāĻŸā§‡ Non-Compliance āĻšāĻŋāϏ⧇āĻŦ⧇ āϧāϰāĻž āĻĒ⧜āϤ⧇ āĻĒāĻžāϰ⧇!

đŸ”Ĩ āĻā§āρāĻ•āĻŋ āϕ⧋āĻĨāĻžā§Ÿ?
RSC āĻ“ BNBC āĻ—āĻžāχāĻĄāϞāĻžāχāύ āĻ…āύ⧁āϝāĻžā§Ÿā§€
👉 Production floor, warehouse, corridor, stair lobby, storage area āĻ“ compartment–āĻ
Certified Fire Sprinkler System āĻŦāĻžāĻ§ā§āϝāϤāĻžāĻŽā§‚āϞāĻ• (āĻā§āρāĻ•āĻŋ āĻ“ āĻŦāĻŋāĻ˛ā§āĻĄāĻŋāĻ‚ āϟāĻžāχāĻĒ āĻ…āύ⧁āϝāĻžā§Ÿā§€)āĨ¤

âš ī¸ āύāĻž āĻĨāĻžāĻ•āϞ⧇ āϕ⧀ āĻšā§Ÿ?
â€ĸ RSC Fire Audit Fail
â€ĸ Corrective Action Plan (CAP)
â€ĸ Production Suspension / major risk flag

✅ āϏāĻŽāĻžāϧāĻžāύ: Certified Fire Sprinkler System (Complete Solution)
āĻ¸ā§āĻŦ⧟āĻ‚āĻ•ā§āϰāĻŋ⧟āĻ­āĻžāĻŦ⧇ āφāϗ⧁āύ⧇āϰ āϤāĻžāĻĒāĻŽāĻžāĻ¤ā§āϰāĻž āĻŦ⧁āĻā§‡ āϤāĻžā§ŽāĻ•ā§āώāĻŖāĻŋāĻ• āĻĒāĻžāύāĻŋ āĻĄāĻŋāϏāϚāĻžāĻ°ā§āϜ āĻ•āĻ°ā§‡â€”
āφāϗ⧁āύ āĻ›ā§œāĻžāύ⧋āϰ āφāϗ⧇āχ āύāĻŋ⧟āĻ¨ā§āĻ¤ā§āϰāϪ⧇ āφāύ⧇āĨ¤

🔹 Fire Sprinkler System āϕ⧇āύ āϜāϰ⧁āϰāĻŋ?
✔ Early Suppression & Fire Spread Control
✔ High-Risk Areas–āĻ āĻĻā§āϰ⧁āϤ āϰ⧇āϏāĻĒāĻ¨ā§āϏ
✔ Fire Pump, Tank, Valve, Alarm Integration āϏāĻš āϏāĻŽā§āĻĒā§‚āĻ°ā§āĻŖ āϏāĻŋāĻ¸ā§āĻŸā§‡āĻŽ
✔ Audit-Ready Design, Installation & Testing Support
Design–Installation–Testing–Documentation āϏāĻŦ āĻāĻ• āϜāĻžā§ŸāĻ—āĻžā§Ÿ

📞 āϝ⧋āĻ—āĻžāϝ⧋āĻ— āĻ•āϰ⧁āύ:
â˜Žī¸ 01742727218


Photos from M/S Ma Engineering  Solution's post 18/12/2025

Fire Hayden system work.

09/12/2025

RSC āϕ⧀? Audit Documents /Checklist

RSC (RMG Sustainability Council) āĻšāϞ⧋ āĻŦāĻžāĻ‚āϞāĻžāĻĻ⧇āĻļ⧇āϰ āϤ⧈āϰāĻŋ āĻĒā§‹āĻļāĻžāĻ• āĻļāĻŋāĻ˛ā§āĻĒ⧇āϰ āϏ⧁āϰāĻ•ā§āώāĻž, āĻ…āĻ—ā§āύāĻŋ–āύāĻŋāϰāĻžāĻĒāĻ¤ā§āϤāĻž āĻ“ āĻŦāĻŋāĻ˛ā§āĻĄāĻŋāĻ‚ āĻ¸ā§āĻŸā§āϝāĻžāĻ¨ā§āĻĄāĻžāĻ°ā§āĻĄ āĻŦāϜāĻžāϝāĻŧ āϰāĻžāĻ–āĻžāϰ āĻāĻ•āϟāĻŋ āĻ¸ā§āĻŦāϤāĻ¨ā§āĻ¤ā§āϰ āϏāĻ‚āĻ¸ā§āĻĨāĻž — āϝāĻž Accord–āĻāϰ āĻĒāϰ āĻ¸ā§āĻĨāĻžāĻĒāĻŋāϤāĨ¤ āĻāϤ⧇ BGMEA, āĻŦā§āĻ°ā§āϝāĻžāĻ¨ā§āĻĄ āĻāĻŦāĻ‚ āĻļā§āϰāĻŽāĻŋāĻ• āĻĒā§āϰāϤāĻŋāύāĻŋāϧāĻŋ— āϤāĻŋāύ āĻĒāĻ•ā§āώ āĻāĻ•āϏāĻžāĻĨ⧇ āĻ•āĻžāϜ āĻ•āϰ⧇āĨ¤
(āϏāĻ‚āĻ¸ā§āĻĨāĻž: RMG Sustainability Council)

RSC–āĻāϰ āĻŽā§‚āϞ āĻ•āĻžāϜ

1ī¸. āĻĢāĻžāϝāĻŧāĻžāϰ āϏ⧇āĻĢāϟāĻŋ āĻ…āĻĄāĻŋāϟ

āĻĢāĻžāϝāĻŧāĻžāϰ āĻĄā§āϰāĻŋāϞ, āĻĢāĻžāϝāĻŧāĻžāϰ āĻĄā§‹āϰ, āĻšāĻžāχāĻĄā§āϰāĻžāĻ¨ā§āϟ āϏāĻŋāĻ¸ā§āĻŸā§‡āĻŽ, āĻ…ā§āϝāĻžāϞāĻžāĻ°ā§āĻŽ āϏāĻŋāĻ¸ā§āĻŸā§‡āĻŽ
āĻ…āĻ—ā§āύāĻŋ āĻĒā§āϰāϤāĻŋāϰ⧋āϧ āĻŦā§āϝāĻŦāĻ¸ā§āĻĨāĻž āĻ¸ā§āĻŸā§āϝāĻžāĻ¨ā§āĻĄāĻžāĻ°ā§āĻĄ āĻŽāĻžāĻĢāĻŋāĻ• āφāϛ⧇ āĻ•āĻŋāύāĻž āĻšā§‡āĻ•

2ī¸.āĻŦāĻŋāĻ˛ā§āĻĄāĻŋāĻ‚ āĻ¸ā§āĻŸā§āϰāĻžāĻ•āϚāĻžāϰāĻžāϞ āϏ⧇āĻĢāϟāĻŋ

āĻŦāĻŋāĻ˛ā§āĻĄāĻŋāĻ‚ āϞ⧋āĻĄāĻŋāĻ‚ āĻĒā§āĻ˛ā§āϝāĻžāύ
āĻ•āϞāĻžāĻŽ, āĻŦāĻŋāĻŽ, āϞ⧋āĻĄ āĻ•ā§āϝāĻžāĻĒāĻžāϏāĻŋāϟāĻŋ
āχāĻžā§āϜāĻŋāύāĻŋāϝāĻŧāĻžāϰāĻŋāĻ‚ āϰāĻŋāĻ­āĻŋāω

3ī¸.āχāϞ⧇āĻ•ā§āĻŸā§āϰāĻŋāĻ•ā§āϝāĻžāϞ āϏ⧇āĻĢāϟāĻŋ

āχāϞ⧇āĻ•ā§āĻŸā§āϰāĻŋāĻ•ā§āϝāĻžāϞ āϞāĻžāχāύāĻŋāĻ‚
ELCB, MCC, PPE usage
āϏāĻžāĻŦ-āĻ¸ā§āĻŸā§‡āĻļāύ āϏ⧇āĻĢāϟāĻŋ

4ī¸. CAP (Corrective Action Plan) Follow-up

āĻ…āĻĄāĻŋāĻŸā§‡āϰ āĻĒāϰ āĻ āĻŋāĻ• āĻ•āϰāĻžāϰ āĻ•āĻžāϜāϗ⧁āϞ⧋āϰ āĻ…āĻ—ā§āϰāĻ—āϤāĻŋ āĻŽāύāĻŋāϟāϰ
āĻĢāϞ⧋-āφāĻĒ āĻĒāϰāĻŋāĻĻāĻ°ā§āĻļāύ

5ī¸. Workers’ Safety Training

āĻ…āĻ—ā§āύāĻŋ āύāĻŋāĻ°ā§āĻŦāĻžāĻĒāĻŖ āĻĒā§āϰāĻļāĻŋāĻ•ā§āώāĻŖ
āχāĻ­āĻžāϕ⧁āϝāĻŧ⧇āĻļāύ āĻŸā§āϰ⧇āύāĻŋāĻ‚
āχāϞ⧇āĻ•ā§āĻŸā§āϰāĻŋāĻ•ā§āϝāĻžāϞ āϰāĻŋāĻ¸ā§āĻ•â€“āĻŽāĻŋāύāĻŋāĻŽāĻžāχāĻœā§‡āĻļāύ

RSC āĻ…āĻĄāĻŋāĻŸā§‡āϰ āϧāϰāύ

1. Initial Audit

āϏāĻŦ āϏ⧇āĻĢāϟāĻŋ āϏāĻŋāĻ¸ā§āĻŸā§‡āĻŽ āĻ“ āĻŦāĻŋāĻ˛ā§āĻĄāĻŋāĻ‚ āĻĄāϕ⧁āĻŽā§‡āĻ¨ā§āϟ āϝāĻžāϚāĻžāχāĨ¤

2. Follow-up Audit

CAP implementation āĻšā§‡āĻ• āĻ•āϰāĻžāĨ¤

3. Maintenance & Safety Audit

āϏāĻŋāĻ¸ā§āĻŸā§‡āĻŽāϗ⧁āϞ⧋ āύāĻŋ⧟āĻŽāĻŋāϤ āĻŦā§āϝāĻŦāĻšāĻžāϰāϝ⧋āĻ—ā§āϝ āĻ•āĻŋāύāĻž āϤāĻž āĻĒāϰ⧀āĻ•ā§āώāĻžāĨ¤

4. Training Verification Audit

āĻŸā§āϰ⧇āύāĻŋāĻ‚ āφāϏāϞ⧇āχ āĻšāϝāĻŧ⧇āϛ⧇ āĻ•āĻŋāύāĻž āϝāĻžāϚāĻžāχāĨ¤

RSC–āĻ āϕ⧀ āϕ⧀ āĻĄāϕ⧁āĻŽā§‡āĻ¨ā§āϟ āϞāĻžāϗ⧇?

āĻŦ⧈āϧ building approval plan
structural design & load plan
electrical single line diagram (SLD)
fire license
fire detection & protection layout
boiler, generator, lift documents
maintenance records
fire drill records
PPE distribution report

āĻĢā§āϝāĻžāĻ•ā§āϟāϰāĻŋ RSC āĻ•āĻŽāĻĒā§āϞāĻžāϝāĻŧ⧇āĻ¨ā§āϏ⧇ āύāĻž āĻĨāĻžāĻ•āϞ⧇ āĻā§āρāĻ•āĻŋ

āĻŦā§āĻ°ā§āϝāĻžāĻ¨ā§āĻĄ/āĻŦāĻžāϝāĻŧāĻžāϰ āĻ…āĻ°ā§āĻĄāĻžāϰ āĻŦāĻ¨ā§āϧ āĻšāϤ⧇ āĻĒāĻžāϰ⧇
āϏ⧇āĻĢāϟāĻŋ āĻā§āρāĻ•āĻŋ āĻŦ⧇āĻĄāĻŧ⧇ āϝāĻžāϝāĻŧ
āĻĢāϞ⧋-āφāĻĒ⧇ āĻŦāĻžāϰāĻŦāĻžāϰ āϰ⧇āĻĄ āĻŽāĻžāĻ°ā§āĻ•
āϏāĻŋāĻ¸ā§āĻŸā§‡āĻŽāĻŋāĻ• non-compliance āĻšāϞ⧇ suspension

āϏāĻšāϜāĻ­āĻžāĻŦ⧇ RSC–āĻāϰ 5āϟāĻŋ āĻĒā§āϰāϧāĻžāύ āĻšā§‡āĻ•āϞāĻŋāĻ¸ā§āϟ

1ī¸.āĻĢāĻžāϝāĻŧāĻžāϰ āϏ⧇āĻĢāϟāĻŋ
2ī¸. āχāϞ⧇āĻ•ā§āĻŸā§āϰāĻŋāĻ•ā§āϝāĻžāϞ āϏ⧇āĻĢāϟāĻŋ
3ī¸.āĻŦāĻŋāĻ˛ā§āĻĄāĻŋāĻ‚ āĻ¸ā§āĻŸā§āϰāĻžāĻ•āϚāĻžāϰ
4ī¸.āĻŸā§āϰ⧇āύāĻŋāĻ‚ āĻ“ āĻĄāϕ⧁āĻŽā§‡āĻ¨ā§āϟ
5ī¸. CAP implementation

Photos from M/S Ma Engineering  Solution's post 15/11/2025

Hayden system box.

Photos from M/S Ma Engineering  Solution's post 09/11/2025

Fire Hayden system work

Photos from M/S Ma Engineering  Solution's post 01/08/2025

RAC (āĻŦāĻžāĻ‚āϞāĻžāĻĻ⧇āĻļ⧇āϰ Rajdhani Unnayan Kartripakkha āĻŦāĻž āϰāĻžāϜāϧāĻžāύ⧀ āωāĻ¨ā§āύ⧟āύ āĻ•āĻ°ā§āϤ⧃āĻĒāĻ•ā§āώ)-āĻāϰ āύāĻŋ⧟āĻŽ āĻ…āύ⧁āϝāĻžā§Ÿā§€ āĻ¸ā§āĻĒā§āϰāĻŋāĻ‚āĻ•āϞāĻžāϰ āϏāĻŋāĻ¸ā§āĻŸā§‡āĻŽā§‡āϰ āϤāĻžāĻĒāĻŽāĻžāĻ¤ā§āϰāĻž āĻ“ āĻĻā§‚āϰāĻ¤ā§āĻŦ āϏāĻŽā§āĻĒāĻ°ā§āĻ•āĻŋāϤ āĻŦāĻŋāώ⧟āϗ⧁āϞāĻŋ āĻŽā§‚āϞāϤ āĻĢāĻžā§ŸāĻžāϰ āϏ⧇āĻĢāϟāĻŋ āĻ“ āĻŦāĻŋāĻ˛ā§āĻĄāĻŋāĻ‚ āϕ⧋āĻĄā§‡āϰ āĻ…āϧ⧀āύ⧇ āφāϏ⧇, āĻŦāĻŋāĻļ⧇āώ āĻ•āϰ⧇ BNBC (Bangladesh National Building Code) āĻ“ Fire Safety Plan Guidelines (FSCD approved) āĻ…āύ⧁āϝāĻžā§Ÿā§€āĨ¤

✅ RAC āĻ“ BNBC āĻ…āύ⧁āϝāĻžā§Ÿā§€ āĻ¸ā§āĻĒā§āϰāĻŋāĻ‚āĻ•āϞāĻžāϰ āϏāĻŋāĻ¸ā§āĻŸā§‡āĻŽā§‡āϰ āĻŽā§‚āϞ āύāĻŋ⧟āĻŽ:

đŸ”Ĩ āϤāĻžāĻĒāĻŽāĻžāĻ¤ā§āϰāĻž āĻ…āύ⧁āϝāĻžā§Ÿā§€ āĻ¸ā§āĻĒā§āϰāĻŋāĻ‚āĻ•āϞāĻžāϰ āĻšā§‡āĻĄ:

BNBC āĻāĻŦāĻ‚ FSCD āĻ—āĻžāχāĻĄāϞāĻžāχāύ⧇āϰ āĻ­āĻŋāĻ¤ā§āϤāĻŋāϤ⧇ (āϝāĻž RAC āĻ…āύ⧁āϏāϰāĻŖ āĻ•āϰ⧇):

āĻ¸ā§āĻĒā§āϰāĻŋāĻ‚āĻ•āϞāĻžāϰ āĻšā§‡āĻĄ āϰ⧇āĻŸā§‡āĻĄ āϤāĻžāĻĒāĻŽāĻžāĻ¤ā§āϰāĻž āĻĒā§āϰāϝ⧋āĻœā§āϝ āĻ¸ā§āĻĨāĻžāύ

Ordinary Temp 57°C to 68°C āϏāĻžāϧāĻžāϰāĻŖ āĻ…āĻĢāĻŋāϏ, āĻļāĻĒ, āϰ⧁āĻŽ
Intermediate 79°C to 93°C āϰāĻžāĻ¨ā§āύāĻžāϘāϰ, āĻ—ā§āϝāĻžāϰ⧇āϜ
High Temp 121°C to 149°C āĻŦ⧟āϞāĻžāϰ āϰ⧁āĻŽ, āĻŽā§‡āĻļāĻŋāύ āĻāϰāĻŋ⧟āĻž
Extra High 163°C+ āϟāĻžāϰāĻŦāĻžāχāύ, āχāĻ¨ā§āĻĄāĻžāĻ¸ā§āĻŸā§āϰāĻŋ⧟āĻžāϞ āĻœā§‹āύ
đŸ”Ĩ āϏāĻžāϧāĻžāϰāĻŖāĻ­āĻžāĻŦ⧇ 68°C āĻŦā§āϝāĻŦāĻšāĻžāϰ āϏāĻŦāĻšā§‡ā§Ÿā§‡ āĻŦ⧇āĻļāĻŋ āĻšā§ŸāĨ¤

📏 āĻ¸ā§āĻĒā§āϰāĻŋāĻ‚āĻ•āϞāĻžāϰ āĻšā§‡āĻĄā§‡āϰ āĻĻā§‚āϰāĻ¤ā§āĻŦ (Spacing):

â–Ēī¸ RAC/BNBC 2020 āĻ…āύ⧁āϝāĻžā§Ÿā§€ (Light Hazard Group āĻāϰ āϜāĻ¨ā§āϝ):

āĻŦāĻŋāώ⧟ āύāĻŋ⧟āĻŽ

āĻ¸ā§āĻĒā§āϰāĻŋāĻ‚āĻ•āϞāĻžāϰ āĻĨ⧇āϕ⧇ āĻ¸ā§āĻĒā§āϰāĻŋāĻ‚āĻ•āϞāĻžāϰ Max 4.6 āĻŽāĻŋāϟāĻžāϰ (15 āĻĢ⧁āϟ)
āĻ¸ā§āĻĒā§āϰāĻŋāĻ‚āĻ•āϞāĻžāϰ āĻĨ⧇āϕ⧇ āĻĻā§‡ā§ŸāĻžāϞ Max 2.3 āĻŽāĻŋāϟāĻžāϰ (7.5 āĻĢ⧁āϟ)
āĻ•āĻ­āĻžāϰ⧇āϜ āĻāϰāĻŋ⧟āĻž āĻĒā§āϰāϤāĻŋ āĻšā§‡āĻĄ Max 21 sqm (225 sq.ft)

Ordinary Hazard Group āĻāϰ āϜāĻ¨ā§āϝ:

āĻŦāĻŋāώ⧟ āύāĻŋ⧟āĻŽ

āĻ¸ā§āĻĒā§āϰāĻŋāĻ‚āĻ•āϞāĻžāϰ āĻĨ⧇āϕ⧇ āĻ¸ā§āĻĒā§āϰāĻŋāĻ‚āĻ•āϞāĻžāϰ 3–4.6 āĻŽāĻŋāϟāĻžāϰ (10–15 āĻĢ⧁āϟ)
āĻ¸ā§āĻĒā§āϰāĻŋāĻ‚āĻ•āϞāĻžāϰ āĻĨ⧇āϕ⧇ āĻĻā§‡ā§ŸāĻžāϞ 2.3 āĻŽāĻŋāϟāĻžāϰ (7.5 āĻĢ⧁āϟ)
āĻ•āĻ­āĻžāϰ⧇āϜ āĻāϰāĻŋ⧟āĻž āĻĒā§āϰāϤāĻŋ āĻšā§‡āĻĄ Max 12 sqm (130 sq.ft)

✅ āĻ…āϤāĻŋāϰāĻŋāĻ•ā§āϤ āĻ•āĻŋāϛ⧁ āϗ⧁āϰ⧁āĻ¤ā§āĻŦāĻĒā§‚āĻ°ā§āĻŖ āĻĒā§Ÿā§‡āĻ¨ā§āϟ (BNBC/RAC āĻ…āύ⧁āϝāĻžā§Ÿā§€):

āĻ›āĻžāĻĻ⧇āϰ āωāĻšā§āϚāϤāĻž āĻ…āύ⧁āϝāĻžā§Ÿā§€ āĻ¸ā§āĻĒ⧇āϏāĻŋāĻ‚ āĻ•āĻŽā§‡ āĻŦāĻž āĻŦāĻžā§œā§‡āĨ¤

āĻ¸ā§āĻĒā§āϰāĻŋāĻ‚āĻ•āϞāĻžāϰ āĻšā§‡āĻĄ āĻ…āĻŦāĻļā§āϝāχ UL Listed/Approved āĻšāϤ⧇ āĻšāĻŦ⧇āĨ¤

āĻĢāĻžā§ŸāĻžāϰ āĻĒāĻžāĻŽā§āĻĒ, āϜāĻ•āĻŋ āĻĒāĻžāĻŽā§āĻĒ āĻ“ āϰāĻŋāϜāĻžāĻ°ā§āĻ­ āĻŸā§āϝāĻžāĻ‚āĻ• āϏāĻš āϏāĻŋāĻ¸ā§āĻŸā§‡āĻŽ āĻĨāĻžāĻ•āϤ⧇ āĻšāĻŦ⧇āĨ¤

āĻŽā§āϝāĻžāύ⧁⧟āĻžāϞ āĻ•āĻ¨ā§āĻŸā§āϰ⧋āϞ āĻ­āĻžāĻ˛ā§āĻ­, āĻĢā§āϞ⧋ āϏ⧁āχāϚ, āĻĒā§āϰ⧇āϏāĻžāϰ āϏ⧁āχāϚ āĻĨāĻžāĻ•āϤ⧇ āĻšāĻŦ⧇āĨ¤

Annual āĻāĻŦāĻ‚ Monthly Testing āĻŦāĻžāĻ§ā§āϝāϤāĻžāĻŽā§‚āϞāĻ•āĨ¤

Want your business to be the top-listed Government Service in Dhaka?

Click here to claim your Sponsored Listing.

Location

Telephone

Address


Dhaka
1212