In order to pour the raft concrete, dewatering in the excavated foundation for the construction of RRM Oghi model composting plant
The Project Accompanying Measure for Promoting Sustainable Urban Development In District Mansehra
13/10/2025
In order to pour the raft concrete, dewatering in the excavated foundation for the construction of RRM Oghi model composting plant
13/10/2025
Solar based electrification installed at different components of RRM Drinking Water Project
13/10/2025
Pilot area Baffa khurd construction of DEWAT, the practical example of proper usage of PPEs and Occupational Health and Safety measures.
13/10/2025
RRM Baffa khurd pilot area, work at progress on different components of DEWAT
13/10/2025
17th April 2025
Progress review mission KfW on-site inspection at RRM pilot area Baffa DEWAT
13/10/2025
21 April 2025
KFW Progress review mission in Tehsil Darband
24/02/2025
From February 19 to February 22, 2025, RRM Project Mansehra held Occupational Health and Safety training for all five TMAs' employees, specifically the sanitary staff, drivers, machine operators, tubewell operators, and helpers, among others. The training's goal was to improve OHS knowledge and educate the frontline workforce about the safety measure mechanism. All TMOs took part and appreciated the training's title, which demonstrated how to protect human life while performing routine tasks and working in harsh conditions. In the future, this comprehended knowledge will help them to allocate some funds for the physical working staff's safety measures also.
24/02/2025
RRM Project Mansehra, Tehsil Mansehra, NC Nogazi, January 26, 2025. The following items were on the meeting's primary agenda:
1. Before the mini tipper arrives, the waste container needs to be placed in front of the household.
2. Children littering the streets 3. Fires inside the containers
3. Debris discovered in the garbage that ought to be there
4. The service recipient's observation and input for enhancement
The Nogazi model for community-led solid waste management is still self-sustaining and upholds social mobilization practices. In the image, residents of various zones are talking about issues they face during daily solid waste management operations and improving the resolution plan, which is the biggest accomplishment of the community in managing and talking about issues.
10/02/2025
5th of February, 2025 RRM Project Tehsil Baffa pakhal, NC Baffa Khud Wastewater treatment plant model scheme construction progress, pictures depicts the RRC work on main drain, Excavation for sludge drying bed, jointing sewer pipes and fixing framework on northern drain.
15/01/2025
RRM Project NC Baffa Khurd _ January 2025 Decentralization wastewater treatment pilot model construction work in progress
Construction activities related to the pipeline sewer connecting the Faridabad area, and the construction of a drainage system at the creek to manage stormwater from the upstream catchment, are currently progressing vigorously. These initiatives are anticipated to enhance the infrastructure and overall quality of life within the community through cleaner enviroment.
08/01/2025
Successful kickoff of Baffa wastewater management project-8th January 2025