29/05/2026
Scheduled Closures for Dallas North Tollway Extension Project in Prosper and Celina, June 1-6
On Monday, June 1 through Saturday, June 6
• The north- and southbound left lane of Dallas Pkwy. from First St. to FM 428 will be closed daily from 6:30 a.m. to 6:30 p.m.
Continuous Closure:
• The right turn lane of westbound FM 428 at Dallas Pkwy. will be closed continuously
These closures will be used to transport topsoil, perform a mass haul of materials and clean the closure area. The entire left lanes will not be closed, and we will ensure there are no conflicts between lane closures within the same areas. Closures will occur at construction exits as needed.
28/05/2026
Based on recent questions we’ve received there's some confusion out there. Let’s clear things up: https://bit.ly/3PSwKhH
27/05/2026
NTTA Traffic Advisory – Dallas North Tollway (DNT) between Mockingbird and Oak Lawn.
The following lane closures will take place on the Dallas North Tollway beginning at 10 p.m. on Friday night (May 29) until 5 a.m. on Monday morning (June 1):
• Two northbound right lanes from Oak Lawn Ave. to Wycliff Ave.
• Two southbound right lanes from Beverly Dr. to Wycliff Ave.
One lane in each direction will remain open to traffic at all times, but drivers should expect delays in the area. These closures are needed for resurfacing the Wycliff Ave. bridge. For more information on DNT bridge repair and resurfacing this year click here: https://bit.ly/DNTMayUpdate
26/05/2026
Better late than never! Our customer survey closes soon – tell us what you think and you’ll be entered to win a $250 Visa gift card: https://bit.ly/4tBk3pT
22/05/2026
Scheduled Closures for Dallas North Tollway Extension Project in Prosper and Celina, May 26-30.
On Tuesday, May 26 through Saturday, May 30:
• The north- and southbound left lane of Dallas Pkwy. from First St. to FM 428 will be closed daily from 6:30 a.m. to 6:30 p.m.
Continuous Closure:
• The right turn lane of westbound FM 428 at Dallas Pkwy. will be closed continuously
These closures will be used to transport topsoil, perform a mass haul of materials and clean the closure area. The entire left lanes will not be closed, and we will ensure there are no conflicts between lane closures within the same areas. Closures will occur at construction exits as needed.
21/05/2026
Please note the upcoming closures of our Customer Service Centers and Administrative Offices. If needed, you can self-manage your account here online at ssptrips.ntta.org
20/05/2026
Celina reclaims the title of fastest-growing US city, according to new Census Bureau data. NTTA’s Dallas North Tollway extension project, slated to open in 2027 – weather permitting, will extend the tollway approximately six miles north of US 380, providing a direct link between downtown Dallas and the growing Celina and Prosper communities. Click here to learn more: https://bit.ly/4ujru5v