Save Monmouth County Water

Save Monmouth County Water Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Save Monmouth County Water, Social service, Holmdel, NJ.

We are a group of citizens trying to protect the contamination of drinking water for over 300,000 residents of Monmouth County including Hazlet, Holmdel, Middletown and more.

Community Magazine Names Kristin Celauro a Local HeroWe’re thrilled to see Community Magazine recognize Kristin Celauro ...
09/13/2026

Community Magazine Names Kristin Celauro a Local Hero

We’re thrilled to see Community Magazine recognize Kristin Celauro as Holmdel’s Local Hero for her tireless efforts to protect our community from potential water contamination associated with the proposed Azura development at the former Vonage site.

As the article notes:

“What makes Kristin's efforts especially remarkable is that she had no prior history of public activism. Motivated solely by a desire to protect her community, she devoted countless hours, significant personal resources, and unwavering determination to an issue affecting hundreds of thousands of Monmouth County residents. Her leadership demonstrates the extraordinary difference one committed citizen can make and embodies the very spirit of a Local Hero.”

One concerned resident. One important issue. One powerful example of what a determined citizen can accomplish.

Congratulations, Kristin, on this well-deserved recognition!

📖 See the photo for the full article, or read it on page 44 of the September issue of Community Magazine:

https://www.monmouthcommunity.com/detailseditions/zone1sept2026








Please help stop the proposed data center at Bell Works.  Attend the Township Committee meeting and the Holmdel Environm...
08/11/2026

Please help stop the proposed data center at Bell Works. Attend the Township Committee meeting and the Holmdel Environmental Commission meeting. Ask hard questions. Holmdel residents deserve answers.

🚨 FLASH ALERT: DATA CENTER PROPOSAL FILED FOR BELL WORKS 🚨

A major data center application has been filed with the Holmdel Planning Board.

Why This Matters

Data centers are not just technology projects—they are among the largest consumers of electricity and water in the modern economy, with long-term consequences for our environment, utility infrastructure, and every ratepayer.

• A single large data center can use up to 5 million gallons of water every day—roughly the daily water needs of 50,000 people.
• New Jersey remains under drought warning, and American Water recently imposed mandatory outdoor water restrictions in Monmouth County.
• Residents are already being hit with soaring electric bills. For many households, monthly electricity costs are now up to 267% higher than they were five years ago.
• According to regional grid data, data center demand accounted for approximately 63% of the increase in capacity prices at the 2024 electric capacity auction—costs that ultimately flow to consumers.

And that's before considering other impacts, including noise, transmission infrastructure, land use, and community character.

📢 Please attend tonight's Township Committee meeting and ask the hard questions.

Residents deserve answers.

The Holmdel Environmental Commission will also discuss the pending Bell Works Planning Board application Wednesday, August 12, at 7:00 PM.

📍 Both meetings will be held at Holmdel Town Hall, 4 Crawfords Corner Road.

Ironically, tonight (Tuesday, August 11, 2026, at 7:30 PM), the Holmdel Township Committee is holding a public hearing on an ordinance to ban data centers in Holmdel.

When the former Vonage property was approved for redevelopment, an outdated, nearly 50-year-old wastewater treatment plant that would have contaminated our drinking water was allowed to be "grandfathered" before the Township Committee decided to build a force main in response to public opposition.

Will Bell Works now be allowed to "grandfather" a massive data center as part of its redevelopment approvals dating more than a decade ago?

New Jersey needs a statewide strategy for evaluating data centers—not piecemeal decisions with regional consequences.

Learn more and sign the petition calling for a comprehensive statewide approach:

https://actionnetwork.org/petitions/we-need-a-statewide-strategy-for-data-centersbefore-its-too-late/

Please share this post and encourage your neighbors to attend. The decisions made now will affect Holmdel—and New Jersey—for decades to come.

A data center is not appropriate at Bell Works due to the extraordinary amount of water and electricity usage and the en...
08/11/2026

A data center is not appropriate at Bell Works due to the extraordinary amount of water and electricity usage and the environmental impact. Please attend the Holmdel Township Committee, Environmental Commission, and Planning Board meetings and ask questions.

Let's stop the madness!

🚨 FLASH ALERT: DATA CENTER PROPOSAL FILED FOR BELL WORKS 🚨

A major data center application has been filed with the Holmdel Planning Board.

Why This Matters

Data centers are not just technology projects—they are among the largest consumers of electricity and water in the modern economy, with long-term consequences for our environment, utility infrastructure, and every ratepayer.

• A single large data center can use up to 5 million gallons of water every day—roughly the daily water needs of 50,000 people.
• New Jersey remains under drought warning, and American Water recently imposed mandatory outdoor water restrictions in Monmouth County.
• Residents are already being hit with soaring electric bills. For many households, monthly electricity costs are now up to 267% higher than they were five years ago.
• According to regional grid data, data center demand accounted for approximately 63% of the increase in capacity prices at the 2024 electric capacity auction—costs that ultimately flow to consumers.

And that's before considering other impacts, including noise, transmission infrastructure, land use, and community character.

📢 Please attend tonight's Township Committee meeting and ask the hard questions.

Residents deserve answers.

The Holmdel Environmental Commission will also discuss the pending Bell Works Planning Board application Wednesday, August 12, at 7:00 PM.

📍 Both meetings will be held at Holmdel Town Hall, 4 Crawfords Corner Road.

Ironically, tonight (Tuesday, August 11, 2026, at 7:30 PM), the Holmdel Township Committee is holding a public hearing on an ordinance to ban data centers in Holmdel.

When the former Vonage property was approved for redevelopment, an outdated, nearly 50-year-old wastewater treatment plant that would have contaminated our drinking water was allowed to be "grandfathered" before the Township Committee decided to build a force main in response to public opposition.

Will Bell Works now be allowed to "grandfather" a massive data center as part of its redevelopment approvals dating more than a decade ago?

New Jersey needs a statewide strategy for evaluating data centers—not piecemeal decisions with regional consequences.

Learn more and sign the petition calling for a comprehensive statewide approach:

https://actionnetwork.org/petitions/we-need-a-statewide-strategy-for-data-centersbefore-its-too-late/

Please share this post and encourage your neighbors to attend. The decisions made now will affect Holmdel—and New Jersey—for decades to come.

Help Replenish Our Drinking Water ReservoirPlease sign our petitionMonmouth County’s ongoing drought conditions and the ...
06/26/2026

Help Replenish Our Drinking Water Reservoir
Please sign our petition

Monmouth County’s ongoing drought conditions and the growing demand on our water supply are a dangerous combination. Did you know that we can set up systems that help the Swimming River Reservoir, which provides drinking water to more than 300,000 residents, including Holmdel, replenish itself?

1. Groundwater Recharge, Activate!

Groundwater recharge is the process by which surface water, from rainfall and streams, moves through the ground to replenish aquifers. In much of southern Holmdel, septic systems actually play an important role in the recharge process, allowing wastewater to be naturally filtered through underground leach fields, and returning it to the groundwater system that helps replenish the Reservoir.

2. Azura Will Toss 45,000 Gallons of Water Every Day into the Ocean and it Never Comes Back

On June 16, 2026, the Holmdel Planning Board approved Phase 2 of the Azura redevelopment at the old Vonage property at 23 Main Street. During the hearing, engineers confirmed that Azura will use approximately 45,000 gallons of water per day. This water will be sent through a $5.2 million sewer line that was never supposed to exist, which the township is building for the developer. This water, which could have been used to recharge our Reservoir, will instead be tossed into the ocean and it never comes back.

This approach is neither sustainable nor responsible.

3. A Modern Septic System at Azura Can Help!

Please sign our petition urging the Township Committee to require the Azura developer to install a modern, state-of-the-art treatment facility with underground leach fields located as far as practical from Willow Brook. Such a system would address environmental concerns while helping preserve and replenish one of Monmouth County's most important drinking water resources.

Petition: https://actionnetwork.org/petitions/help-replenish-our-drinking-water-reservoir/

Thank you.

Kristin Celauro
Save Monmouth County Water









02/04/2026

02/02/2026

Join the Fair Haven Environmental Commission for a presentation by Dr. Chris Obropta of Rutgers Water Resources Program
Wednesday, February 4
6:30 p.m.
Fair Haven Community Center

02/01/2026

Dear Friends of Save Monmouth County Water (“SMCW”),

We hope this post finds you safe and warm. We wanted to provide you with an update on Azura at Holmdel’s wastewater plan and SMCW’s position on the proposal.

The Township Committee Approves a “Force Main” for Azura
On January 27, 2026, the Holmdel Township Planning Board gave preliminary and final approval to the redevelopers for Phase 1 of Azura at Holmdel, also known as the former Vonage headquarters.

The approval included a revised wastewater treatment plan: the Township Committee reached an agreement with the developer to install a new “force main” that, once installed, will take all wastewater from the development to Bell Works, and then on to the Bayshore Regional Sewerage Authority (“Bayshore”).

While this plan solves one problem, it unfortunately creates serious new problems that make the plan unsustainable.

A Force Main will Deplete the Swimming River Reservoir
The Swimming River Reservoir relies on water inflows from streams, rainwater, and underground water. Therefore, in this part of Holmdel, septic systems and leach fields are actually a very important source of water for the Reservoir. The problem with allowing the wastewater to go to the Bayshore is that it will get tossed into the ocean and never come back to replenish the Reservoir, which is already experiencing drought conditions and ever-increasing demand.

Only Low-Density Development Should be Allowed

It was decided years ago that there should be no sewer lines in this part of Holmdel. This is also why, at the state level, this area of Holmdel, known as the “Southern Slope”, is zoned PA-5, signifying the most ecologically sensitive area, which should be protected and only low-density development should be allowed.

Tapping into the Bell Works Sewer Line Sets a Dangerous Precedent
In 1992, Holmdel Township reluctantly permitted the building now known as Bell Works to have a sewer line. This line was supposed to be restricted. In 2012, the redevelopment of Bell Works included 225 residential units. Despite the restrictions on the sewer line, the 225 units were allowed to access the sewer line. There is significant, undeveloped land in this part of Holmdel. If a force main is permitted for this property, what is to stop developers from suing the township for the same access?

SMCW appreciates the work the Holmdel Township Committee and Planning Board have put into this project. However, we firmly believe that the Township should insist that the developer of Azura adhere to the plans long established for this part of Holmdel and install a new, state-of-the-art package plant, with fully underground leach fields as far away from the Willow Brook (Category 1 tributary of the Swimming River Reservoir) as possible. The open-air wastewater lagoon should be decommissioned.

Thank you for your support in this process, without which we don’t believe that the Township Committee would have responded and stopped the contamination of our drinking water.

SAVE MONMOUTH COUNTY WATER



Great post about the Township's solution to the wastewater contamination by the Vonage redevelopment.
01/31/2026

Great post about the Township's solution to the wastewater contamination by the Vonage redevelopment.

11th-Hour Solution to Water Contamination
Will It Come with Long-Term Side Effects?

For some time, residents have expressed concerns about the contamination of drinking water from inadequately treated wastewater that will be discharged directly into Willow Brook, which feeds the Swimming River Reservoir, the source of potable water for over 300,000 Monmouth County residents. Residents have urged the Township Committee and the Planning Board to require the redeveloper at the former Vonage property to install a modern wastewater management plant with subsurface disposal of the wastewater.

https://betterholmdel.wixsite.com/home/post/holmdel-planning-board-and-tc-actions-raise-questions

At the Jan. 22nd Township Committee meeting, Mayor Rocco Impreveduto revealed an agreement with the redeveloper to address residents’ concerns about drinking water contamination.

Instead of requiring the redeveloper to construct a new modern wastewater management plant, the Township will install a “force main” sewer line and connect it to the existing force main at Bell Works. Mayor Impreveduto stated that this approach would take “all environmental concerns off the table.” He further explained that the new sewer line would be sized exclusively for the Vonage redevelopment and deed-restricted to prevent additional development in southern Holmdel.

A few days later, the Holmdel Planning Board approved the developer’s plan at its Jan. 27, 2026 meeting.

While avoiding water contamination is viewed by residents as a step in the right direction, some have expressed concerns about the implications of the new force main sewer line. These concerns include the potential for increased high-density development in the future, endangering the environmentally sensitive area, and the lack of water regeneration for the Swimming River Reservoir.

“We had to go in on our own; we had to organize. We had to hire professionals, spend money, spend lots of time trying to protect ourselves and the environment, when we thought that that’s what you would be doing. So, the frustration grew,” resident Kristin Celauro said at the Township Committee meeting.

The bucolic nature of southern Holmdel has been maintained largely because of non-sewered planning and policy.

“Déjà Vu All Over Again”

Most of southern Holmdel is designated as an “Environmentally Sensitive” area (Planning Area or PA-5), including the former 473-acre Bell Labs site on Crawfords Corner Road.

Before 1992, Bell Labs operated two on-site sewage treatment plants - one for standard waste and another serving a chemical laboratory. Due to concerns about the treatment plant nearing the end of its useful life, and because effluent from the chemical laboratory contained dangerous levels of heavy metals and other toxic substances that were being discharged into the Ramanessin Brook at less than one mile from the Swimming River Reservoir, Bell Labs requested permission from the Township to connect to the municipal sewer system in northern Holmdel.

Aware of the Township’s long-standing policy against sewering environmentally sensitive areas in southern Holmdel, Bell Labs requested that the sewer line be designated as a “sole-source” line, intended exclusively for the chemical laboratory.

In 1992, driven by concerns over toxic metal discharge into the Swimming River Reservoir, the Township reluctantly agreed to permit a sewer line that would transport the hazardous waste to the larger and more sophisticated Bayshore Regional Sewer Authority treatment facility. For practical reasons, effluent from the main office building was also included. Importantly, the Township explicitly stated that the sewer line was approved solely for the existing facilities and not for the entire property.

In 2012, the redevelopment plan for the former Bell Labs property included the construction of 225 new residential units along with the repurposing of the existing building into a mixed-use “metrohub.” Despite the earlier 1992 restriction, the Township allowed the new high-density residential units to connect to the existing sewer line.

In the Spring 2013 Township Newsletter, then-Mayor Patrick Impreveduto assured residents that adjacent properties would not be permitted to connect to the sewer line, saying there are “very clear and specific requirements.”

Fast forward to 2026: Mayor Rocco Impreveduto, son of former Mayor Patrick Impreveduto, is now similarly assuring residents that the new force main sewer line, which will be connected to the Bell Works sewer line, will be used exclusively for that 299-unit development and that no other properties will be allowed to connect due to the size of the new sewer line and deed restrictions.

History has already shown to repeat itself. Will it do so again as pressure for increased affordable housing grows in the future? Are other developers watching and will they sue for similar access?

Financing

In most development and redevelopment projects, developers bear the costs of wastewater management—whether through on-site treatment facilities or by constructing sewer lines to connect to existing systems.

However, for the former Vonage redevelopment, the Township has agreed to construct the new force main sewer line at an estimated cost of $5.2 million. Twenty percent of this cost will be funded through the Township’s affordable housing trust fund, which is financed by developer contributions.

The Township will issue bonds or notes to cover the remaining balance (approximately $4 million) and will enter into a special assessment agreement under which the redeveloper will pay $50,000 per quarter to the Township over a 30-year period. In effect, the Township is using its credit rating and borrowing capacity to finance the sewer project on behalf of the redeveloper.

Trucking of Wastewater Off-Site

For a period of three years, the redeveloper has agreed to collect and pump wastewater from the project into tanker trucks for off-site disposal at its own cost and expense.

Once the new sewer line is completed and the project is connected, the redeveloper, at its own expense, will decommission the existing wastewater management plant.

Stay tuned. This is breaking news, and we will share additional information as it becomes available.

# # #








Reminder: please sign the petition if you have not done so.  If you did, THANK YOU.  Please share with friends and neigh...
01/22/2026

Reminder: please sign the petition if you have not done so. If you did, THANK YOU. Please share with friends and neighbors.

Please Sign the Petition! The Azura at Holmdel (former Vonage) development poses grave risks to our drinking water and our communities. The Holmdel Township Committee (“TC”) has the power and the authority to stop this health hazard and save our drinking water for now and generations to come. Pl...

Willful Contamination of Our Drinking Water Defies Common SenseA sign on the gate before entering the fenced-in spray fi...
01/20/2026

Willful Contamination of Our Drinking Water Defies Common Sense

A sign on the gate before entering the fenced-in spray field on the old Vonage property in Holmdel (now known as Azura) states that the wastewater effluent being sprayed is non-potable water.

Yet, for six months of the year, the Azura redevelopment seeks to “grandfather” in an outdated, almost 50-year old wastewater management plant to discharge this same wastewater effluent directly into Willow Brook, which feeds into the Swimming River Reservoir, the source for potable water for over 300,000 residents, including Colts Neck, Hazlet, Holmdel, Middletown, and surrounding towns.

Potable water means water that is safe for drinking, cooking, and hygiene; as opposed to non-potable water (like wastewater), which poses health risks.

The willful contamination of our drinking water is outrageous.

The Holmdel Township Committee has the power and the authority to put residents’ health and safety first, and to stop this disaster before it happens.

Please sign our petition urging the Holmdel Township Committee to require the Azura redeveloper to install a modern wastewater management system that meets current standards.

https://actionnetwork.org/petitions/urge-holmdel-tc-to-prevent-health-hazard/

























Address

Holmdel, NJ
07733

Website

Alerts

Be the first to know and let us send you an email when Save Monmouth County Water posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Category