🚧 Transforming Roads: From Worn-Out Asphalt to New Oil Sand🚧

Ever wondered how the Sabine Road Department revitalizes old, tired asphalt roads into robust Oil Sand surfaces? 🛤️ Join us on this journey as we unveil the transformation process!

In Part 1, we kick things off by diving into the initial steps for building a durable Oil Sand road. In Part 2, we show what equipment is needed and how our dedicated team operates the equipment to “lay down” Oil Sand.

🔍 Follow along for Part 3 the finished product!

The convoy will start around daylight tomorrow morning, Monday, August 31st, and scheduled to be finished by 7:30-8:00 a...
08/30/2026

The convoy will start around daylight tomorrow morning, Monday, August 31st, and scheduled to be finished by 7:30-8:00 am.

Monday morning, August 31st Many PD will be es**rting four extra wide , extra long trucks down San Antonio Ave all the way down Highway 6 to New Hope Rd.

Traffic will be blocked from San Antonio Ave at 171 all the way to the New Hope Road turnoff.

The convoy will start around daylight Monday morning and hopefully be finished by 7:30-8:00 am.

Please make arrangements to avoid this route as it will create delays.

At this time, we do not know what time we will have es**rt the unloaded vehicles back through town, but will give updates as we learn them.

Thank you!

08/18/2026

🚧 Transforming Roads: From Worn-Out Asphalt to New Oil Sand🚧

Ever wondered how the Sabine Road Department revitalizes old, tired asphalt roads into robust Oil Sand surfaces? 🛤️ Join us on this journey as we unveil the transformation process!

In Part 1, we kick things off by diving into the initial steps for building a durable Oil Sand road. Stay tuned as we share a behind-the-scenes look at our dedicated team in action.

🔍 Follow along for an inside look at our road renewal process!

08/12/2026

Final video (2) of CB Byrd and Horseshoe Road reconstruction. Thanks to an unnamed local for the video footage!

08/12/2026

Final video (1) of CB Byrd and Horseshoe Road reconstruction.

08/10/2026

Cutting final batch of oil.

08/05/2026

CB Byrd and Horseshoe Drive UPDATE... The rain last night delayed our plans of mixing oil and relaying the road. We will resume as soon as the road is dry enough. Please be patient and understand we can't control the weather and we are just as anxious to get these roads complete as all of you are!

08/05/2026

Day 2. Horseshoe Drive.

08/05/2026

Day 2. CB Byrd Road.

Address

25981 Highway 171
Many, LA
71449

Opening Hours

Monday 6am - 3:30pm
Tuesday 6am - 3:30pm
Wednesday 6am - 3:30pm
Thursday 6am - 3:30pm
Friday 6am - 3:30pm

Telephone

+13182566231

Alerts

Be the first to know and let us send you an email when Sabine Parish Road Department posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to Sabine Parish Road Department:

Shortcuts

Share