Cross River Rail Delivery Authority

Call Directions Website Contact the organization

Cross River Rail Delivery Authority Brisbane's new underground. Once operational Cross River Rail will transform the way we travel across the whole of South East Queensland.

Cross River Rail is a much needed second river crossing at the core of the SEQ rail network, with capacity to run as many as 24 trains in each direction per hour. Not only will it unblock a bottle neck at the core of the current rail network and enable increased frequency of trains across the whole of South East Queensland, a second rail path through the C*D will also increase network reliability and improve rail overall as a customer experience. The project includes a new 10.2km rail line that includes 5.9km of twin tunnels running under the Brisbane River and C*D; with four new underground stations at Boggo Road, Woolloongabba, Albert Street and Roma Street. The Cross River Rail Delivery Authority is also delivering multiple supporting projects and activities in conjunction with Queensland Rail and the Department of Transport and Main Roads, including accessibility rebuilds for eight surface stations; construction of three new stations on the Gold Coast; upgrades for stabling yards; track works and surface rail enhancements; and the introduction of a new world-class digital train signalling system. Journeys will be quicker door-to-door; there will be new stations in more convenient locations; there will be capacity to run more trains more often; and public transport will become a more viable option for the whole of our region, helping to ease congestion on our roads.

While all of our stations undergo an extensive testing and commissioning regime, some moments remind you more than other...
15/09/2026

While all of our stations undergo an extensive testing and commissioning regime, some moments remind you more than others of the importance of ensuring they're ready for all passengers.

Our Accessibility Reference Group recently visited Woolloongabba station for a tour, giving them the opportunity to see the features and systems customers will use every day.

Comprised of individuals with lived experience and representatives from disability sector organisations, the Accessibility Reference Group has been consulted on the design, amenity, accessibility and technology systems of all our surface and underground stations. This allows us to identify pain points and opportunities to make sure our stations are functional and inclusive for all customers.

As ARG member Robert said "It feels great because a lot of what we've talked about over the last five years has been put into practice. The whole station is user-friendly, better for people in wheelchairs, older people or whoever. It's a really nice space. You normally don't get this space in a train station."

11/09/2026

Did you catch us on the news? ๐ŸŽฅ

We invited media down to check out the new Albert Street flood protection barrier ๐Ÿ‘€ This incredible piece of engineering is the first of its kind. Keep watching to see the โ€˜esky Lid' in action.

CCTV, TVS, VT, PSD, HVAC and HAL ๐Ÿค” Do you know what they are?Hint: They are just some of the systems that are currently ...
07/09/2026

CCTV, TVS, VT, PSD, HVAC and HAL ๐Ÿค” Do you know what they are?
Hint: They are just some of the systems that are currently being tested in our underground stations.

There is a flurry of testing and commissioning work happening on the all equipment and systems inside our four stations, to make sure they operate correctly, safely and are ready for passenger services.

This is the stage of the project where we make sure every individual aspect of the new underground line works, first individually and then followed by integration testing where we make sure all those systems operate together.

03/09/2026

ICYMI ๐Ÿ‘€ This is how the Albert Street station entrance took shape. The canopy will provide shade for station users and the new Albert Street Green Spine public plaza below ๐ŸŒฟ๐Ÿ—๏ธ

27/08/2026

This week the final hoardings come down on the first stage of the Albert Street pedestrian zone that we are handing over to Brisbane City Council, to be included as an extension of the Queen Street Mall.

This area is immediately in front of the future northern entrance to the Albert Street station, which is a short hop to the Queen Street Mall, Uptown and Wintergarden retail precincts.

The next stage will be the section between Charlotte Street and Mary Street, right in front of the main station entrance. Which has already started to be transformed with new paving and trees ๐ŸŒด๐ŸŒด

Keep watching to see how what was just a render has become a reality.

21/08/2026

Boggo Road is the latest of our underground station sites to commission its Tunnel Ventilation System (TVS) fans. Keep watching to find out how the fans stop the tunnels from getting hot ๐Ÿฅต

This is all part of the first phase of testing, making sure all the equipment that's been installed in the stations is working as intended ๐Ÿ› ๏ธ๐Ÿš‡
The TVS fans are just one of thousands of systems the need to be tested to ensure the underground station and tunnels are safe, reliable and ready for passengers.

Reminder the new Roma Street Busway Platform 1 is now open ๐Ÿšโ—Passengers will be able to access it via the new stairs and...
10/08/2026

Reminder the new Roma Street Busway Platform 1 is now open ๐Ÿšโ—

Passengers will be able to access it via the new stairs and lifts located inside the Roma Street station entrance.

For more information head to the ๐Ÿ”— comments

Somewhere over a rainbow where overpasses fly ๐ŸŒˆ๐ŸŽตThese photos were captured during the fitout and as we lifted in the new...
07/08/2026

Somewhere over a rainbow where overpasses fly ๐ŸŒˆ๐ŸŽต

These photos were captured during the fitout and as we lifted in the new 34 metre long, 54-tonne pedestrian footbridge with a 500-tonne crane ๐Ÿ—๏ธ Marking a huge project milestone for Merrimac station!

Merrimac Station is one of three new Gold Coast stations being delivered to better connect South East Queensland's growing population.

06/08/2026

Donโ€™t forget next week this will be a reality ๐Ÿ“ข ๐Ÿš

We've been busy testing the new permanent bus Platform 1 at Roma Street and from August 10 it will be open to passengers! You will be able to access Platform 1 via the new stairs and lifts inside the new Roma Street Station building.

Some construction works will be ongoing and we thank you for your patience as we deliver these upgrades. We look forward to welcoming you to the new bus platform. For more information head to the ๐Ÿ”—๐Ÿ‘‡comments.

We were delighted to have 40 guests with us at Albert Street station last week and as part of the Brisbane Open House pr...
28/07/2026

We were delighted to have 40 guests with us at Albert Street station last week and as part of the Brisbane Open House program.

The tour was led by the senior engineers who are delivering Albert Street station, joined by representatives from Hassell, the architecture firm behind the stationโ€™s design.

The attendees got to explore the future station from the entrance down to platform level, getting an up-close look at key features already in place, including the elevators, platform screen doors and architectural finishes.

Address

Level 1, 151A Elizabeth Street
Kangaroo Point, QLD

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+611800010875

Alerts

Be the first to know and let us send you an email when Cross River Rail Delivery Authority posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to Cross River Rail Delivery Authority:

Shortcuts

Share