⚠️ PUBLIC NOTICE: ECOLOGY & CULTURAL HERITAGE SURVEYS ⚠️
The BHP Accommodation Project team is planning to undertake Ecology and Cultural Heritage surveys between:
🔷 27 October and 30 October 2026, from 8:00am to 5:00pm
🔷 3 November and 6 November 2026, from 8:00 am to 5:00 pm,
within the designated survey area (shown in pink below).
As part of the survey activities, personnel will be required to walk throughout the survey areas and access locations within the footprint using Light Vehicles (LVs).
The survey area includes sections adjacent to:
🔷Opal Road
🔷 Olympic Dam Highway (110 km/h zone)
🔷Olympic Way in Roxby Downs (near the Golf Club), and
🔷Areas south of the Roxby Downs Wastewater Treatment Plant.
Survey work adjacent to the Olympic Dam Highway will be accessed via the powerline track running alongside the highway.
"Work in Progress" signage will be installed at the entry and exit points of the survey areas along Opal Road for the duration of the works.