17/06/2026
Integrated Engineering. Better Project Outcomes.
Building successful Solar and Battery Energy Storage System (BESS) projects requires far more than simply installing equipment. It demands the right expertise across every stage of design and delivery.
At TOBCO, we believe the strongest projects are delivered through the integration of three core disciplines from day one:
Civil Engineering
Site preparation, earthworks, drainage, access roads, foundations, and cable infrastructure.
Electrical Engineering
High and medium voltage systems, grid integration, balance of plant design, protection systems, controls, and commissioning.
Mechanical Engineering
Equipment installation, structural systems, thermal management, fire protection interfaces, and overall system integration.
By bringing these disciplines together under a coordinated delivery model, solar and BESS projects can be delivered more safely, more efficiently, and with greater confidence in long-term performance.
As Australia’s energy transition accelerates, integrated engineering and ex*****on will remain critical to delivering reliable renewable infrastructure at scale.
For project enquiries or to learn more about TOBCO’s capabilities, contact us at:
📞 (02) 8000 1224
✉️ [email protected]
🌐 www.tobco.com.au
12/06/2026
Friday contributions- footpaths near the beach, asp work in the suburbs and my favourite …a pole in the central west.😂
10/06/2026
Long weekend behind us- it’s back to work with the elevated pedestrian walkway on the northern beaches of Sydney . Screw pile capping and setting up for a concrete footpath.
05/06/2026
Heading into the long weekend! Traditionally firecracker weekend- OH&S, modern slavery and chain of responsibility laws have probably made sure no one without a cert 9 in shot -firing can light a firecracker . So instead, check these photos out from around the job sites this week!
03/06/2026
Fire it up big boy! TOBCO’s maintenance team is at Sydney Olympic park everyday making sure all the electrical assets are working. It’s been 27 years since most of this stuff was built. I know I was there. So it’s up to TOBCO to be vigilant and checking everyday to keep this special place alive and running!
28/05/2026
From this to this! Our Electrical Services team has created a magical space of lighting in a new community Centre in Western Sydney from scratch.
27/05/2026
Tunnel lighting progress. TOBCO’s electrical team has been seeking shelter in an old heritage tunnel installing gallery style lighting that will enhance the use of this old neglected space. With all the wet weather around this has been a good project to work on.
21/05/2026
Work continues on multiple work sites this week! New areas have been opened up and trenching accelerates in the inner west. From civil engineering to power & water installation TOBCO continues to deliver for its clients.
19/05/2026
Good progress on the northern beaches pedestrian walkway. Very hard to get good Productivity with all the restrictions working beside a busy road and the edge of a cliff! But the team on site is working hard to get these areas completed.