Hatir jheel

Hatir jheel

Share

The scheme is also designed to help ground water percolation.

The public facilities developed under the development scheme include a 9-kilometre east-west connecting express road, 8km service roads, 477-metre bridges, 9km footpath, 10km lakeside walkway, 260-metre viaduct, 400-metre overpass, an integrated drainage management connecting Begunbari canal with the Gulshan-Banani lakes, a sewer network, an aesthetic public space, and waterfronts. The 302-acre si

Want your business to be the top-listed Government Service in Dhaka?

Click here to claim your Sponsored Listing.

Location

Website

Address


Banglamotor To Rampura
Dhaka