This page is about the Athea and Dromada Windfarms Co Limerick. The site has 19 GE1.5 Wind Turbines.

Dromada Windfarm Commenced Turbine Delivery and Er****on in June 2009 and was completed and operational in February 2010. Athea Windfarm Commenced Turbine Delivery and Er****on in July 2013 and became fully operational in January 2014. The site has 16 turbines in all with 9 GE 1.6 Turbines and 7 2.85 Turbines.

15/09/2018
Photos 28/10/2016

LG 1550 Crane after lifting blades onto GE 1.6 Turbine at Athea windfarm.

Photos 28/10/2016

LTM 1500 8.1 Crane lifting Blades ON GE 1.5 Turbine At Dromada.

28/10/2016

LTM 1500 8.1 Crane Erected the GE 1.5 Turbines at Dromada windfarm. The LG1550 Crane Erected The GE 1.6 Turbines and The 2.85 Turbines.