National High Speed Rail Corporation Limited

National High Speed Rail Corporation Limited

Share

A Joint Venture of Government of India & Participating State Governments for Implementing High Speed The proposed corridor lies in Western Railway zone.

NHSRCL is implementing the project of high speed train corridor between Ahmedabad and Mumbai. The total length of proposed High Speed Railway Corridor works out to be 508.17km. The route of Mumbai Ahmedabad High Speed Rail will be passing through two states, Maharashtra and Gujarat and one Union Territory, Dadra and Nagar Haveli, of the Union of India. It shall starts from Bandra Kurla Complex in

31/05/2026

Say NO to respiratory problems this winter.
Kapalabhati is your natural shield against the cold. This technique clears sinuses, fights congestion, and strengthens your lungs. Your ultimate solution for a healthy, breath-free season.

30/05/2026

Dive deep into relaxation with Matsyasana. This powerful pose helps alleviate respiratory issues, improves digestion, and stretches the neck to keep your thyroid healthy.

28/05/2026

Wishing everyone a blessed Eid-ul-Zuha. May this sacred occasion inspire compassion, unity and goodwill for all of us.

Ministry of Railways, Government of India

27/05/2026

A 45-metre span over the busy Kalupur Flyover is successfully launched using the Span-by-Span method.

This is an important crossing between the Sabarmati and Amdavad Bullet Train stations on the Mumbai–Amdavad Bullet Train corridor.

Constructed with 19 concrete segments and weighing around 1200 MT, the span er****on was completed in just 3 nights under carefully planned night traffic blocks to minimise disruption to daily commuters.

Ministry of Railways, Government of India MyGovIndia Press Information Bureau - PIB, Government of India Gujarat Information PIB in Gujarat DD News Gujarati

25/05/2026

Through mountains, rivers, marshlands and some of the most complex construction zones in Maharashtra, India’s first Bullet Train corridor is steadily taking shape 🇮🇳

This 135 km elevated stretch is a story of scale, precision and engineering excellence, where every structure built is overcoming a new challenge.

Here’s a glimpse of the upcoming film on the Maharashtra section of the Mumbai-Amdavad Bullet Train Project.

Watch the full film on NHSRCL’s YouTube channel : https://youtu.be/3rFFBkH8gkk

Ministry of Railways, Government of India MyGovIndia Press Information Bureau - PIB, Government of India

24/05/2026

Bhramari Pranayama plays a vital role in mental wellness. The practice aids in the alleviation of stress and anger while fostering an environment conducive to meditation. It is a key component of a balanced yoga routine.

Photos from National High Speed Rail Corporation Limited's post 23/05/2026

The cutterhead of the second Tunnel Boring Machine (TBM) has been successfully lowered at Sawli (Ghansoli) near Mumbai, Maharashtra. Measuring 13.6 metres in diameter and weighing 350 tonnes, the cutterhead marks the final step in the primary assembly of the TBM’s main shield.

This second TBM will start its journey from Sawli (Ghansoli) towards Vikhroli for the construction of the 21-km underground tunnel section of the project.

Equipped with 84 cutter discs, 124 scrapers and 16 bucket lips, the TBM is designed for efficient excavation and muck removal during tunnelling operations.

Ministry of Railways, Government of India MyGovIndia Press Information Bureau - PIB, Government of India Maharashtra DGIPR DDNewsLive All India Radio News

21/05/2026

Be a part of the Mumbai-Ahmedabad Bullet Train Project!

NHSRCL is looking for talented professionals to join the team:

🔹 JGM (Rolling Stock) — 01 Post
🔹 Senior Manager (Rolling Stock) — 02 Posts
🔹 Assistant Public Relations Manager — 01 Post

📍 Place of Posting: Anywhere in NHSRCL / MAHSR Project
📅 Last Date to Apply: 05 June 2026 | 11:59 PM

👉 For details & to apply, visit: https://nhsrcl.in/en/career/vacancy-notice

Ministry of Railways, Government of India

21/05/2026

Another steel bridge has been launched at Bharuch, Gujarat for the Mumbai–Ahmedabad Bullet Train, marking another leap forward! A 130-metre, 2900-tonne span now stands tall, bringing us closer to high-speed connectivity.



Ministry of Railways, Government of India MyGovIndia Press Information Bureau - PIB, Government of India

20/05/2026

A 130‑metre‑long steel bridge span has been successfully launched for the Mumbai–Amdavad Bullet Train Project near Tralsi village, Bharuch, Gujarat, crossing the busy Surat–Vadodara railway section.
Standing 18 metres tall and 15.5 metres wide, this span weighs nearly 2900 metric tonnes.



Ministry of Railways, Government of India Press Information Bureau - PIB, Government of India MyGovIndia DD News Gujarati Gujarat Information

Want your business to be the top-listed Government Service in New Delhi?

Click here to claim your Sponsored Listing.

Location

Telephone

Address


National High Speed Rail Corporation Limited (NHSRCL) 5th To 7th Floors, Tower D, World Trade Centre, Nauroji Nagar
New Delhi
110029

Opening Hours

Monday 9:30am - 6pm
Tuesday 9:30am - 6pm
Wednesday 9:30am - 6pm
Thursday 9:30am - 6pm
Friday 9:30am - 6pm