19/01/2021
Aqaba hospital
19/01/2021
Aqaba hospital
06/08/2018
14/12/2015
Basra project
11/12/2015
Basra um qaser projects
10/11/2015
18/09/2015
DFAC building in Al Barjasieh project
20/08/2015
15/02/2015
al basra - project / iraq
Paragraph: Maani Prefab builds and installs the first Mobile Communications Unit in Jordan, also known as MCUs. The unit in itself is a telescopic tower that is 21 meters high. The main function of MCUs is to provide network coverage in uncovered and newly developed areas, in addition to strengthening network signals in crowded & dense events.
The time needed to install MCUs does not exceed 4 hours, since Maani Prefab managed building a unit that is so practical and effective, it is self-loading & self-offloading and does not require a crane. In addition, in challenging areas that is limited in space, Maani Prefab provides an alternative MCU that is only 9 meters of height, limiting the space needed for the MCU foundation.
Every telecommunications company within the Kingdom and region can benefit highly from Maani Prefabs MCUs.