11/02/2020
A good investment!
Lot for.Sale!
Palo alto at the Boundary of Antipolo/Baras & tanay Leisure farm & Residential Resort with waterfalls and forest Reserve.
for as low as P795k/150sqm installment basis.
pm me for tripping schedule and other inquiries.
07/02/2020
For sale LoT only:
Glenrose executive village taytay Rizal
√163sqm=P2,282,000 TCP
Monteverde Royale
taytay Rizal
√193sqm=P1,455,000 TCP
√222sqm=P1,665,000 TCP
√166sqm=P1,245,000 TCP
EastGate
Taytay Rizal
√140sqm=P1,680,000 TCP
for ocular visit pls direct pm me.
📷ctto
06/06/2019
We are looking Sales Agents!
at your own time at space😄
unlimited outright incentives, cash advances, commissions, travel incentives and many more.
pm us how..
#09275810912
04/03/2019
√Pabahay na pwede sa Pag-ibig?check!
pag wala naman Pag-ibig, pwede din naman inhouse..
√clayton heights, ibiza, sorrento at SOON TO OPEN?? sa Php5,000 halaga 👌👌👌
√malapit sa lahat, quezon city, marikina, pasig, cainta, antipolo..
√ si developer na po magaasikaso sa processing,ang iintindihin nyo lang kundi e submit lang po kelangan na manga dokumento at sympre ung pambayad sa equity at amortization 💵💰💳
tara usap tayo, iba na ang nauna..
meron diskwento nag aantay..🔑🔑🔑
Para sa tripping schedule at detalye:
becka-megaeast Prop.
09275810912
03/03/2019
Palo Alto lot for sale by Sta.lucia Land
Php5,300/per sqm
👉Sa halagang Php795,000 pesoses meron kna loteng pwede pagtayuan ng dreamhouse mo.🏠🏡
👉kung nature lover ka pasok ka rin dito..
marami puno, nature falls sa loob po ng subdivision galing sa bundok ng sierra madre kaya advantage sayo kasi di kana dadayo pa..konting jogging at walking andyn na..👟🏃🏃
👉45mins travel time from sta.lucia mall cainta.
kaya pag interesado tripping po tayo.
pm us or contact nyo po etong number..
0927 5810912
03/03/2019
Para po sa like mag SALES AGENT..
iniinvitahan ko po kayo na mag join po sa March 9(sabado) banaba san mateo rizal sponsored by Apec homes developer.
Pakidala lang po 1x1 at photocopy ng valid id at tin number/id.. 📜📑📖📚📝
if wala pa po on hand na requirement oke lang po to follow na lang.. dalhin na lang po ung SARILI muna..😊 minsan lang kasi etong kaganapan kaya wag na pag isipan pa..🙋🙋
Pag uusapan po dito ung produkto na pabahay na benebenta at kung pano po kayo KIKITA ng UNLI halaga..👌👌👌
kahit nasa bahay, nagtratrabaho ka man at kahit anong edad pasok po tayo dito..
tara pm nyo po ako para matulungan ko po kayo..
becka ebin(fb acct)
megaeast prop.
0927 5810912
03/01/2019
looking for agents..
if interested pls contact us:
0927 5810912
0922 3365641
01/11/2018
Single Detached House and Lot
Located at Brgy. Banaba San Mateo
Near SM San Mateo, Batasan Quezon City
Back of Puregold San Mateo
Thru Bank Financing
3 Bedroom, 2 Toilet & Bath, with Gate
Pm for details
04/10/2018
updates for our railways..
LRT-1 Extension from the existing Baclaran station to Bacoor, Cavite, which starts mid-2018 with a target completion of 2021
LRT-2 East and West Extensions; from the existing Santolan station to Masinag, Antipolo, and from the existing Recto station to Pier 4 of the Manila North Harbor; with a target completion by the first quarter of 2019for the East extension.
LRT-4 which runs from Taytay, Rizal to the Ortigas Business District, with an initial target completion of June 2021. But that target (and those station assignments) were set and planned when the project was still under the Public Private Partnership (PPP) program, and was contingent on a four-year construction period from 2017. Last we've heard, proposals for the LRT-4 project were being prepared by local businessman Salvador B. Zamora III, along with Chinese firms in the fourth quarter of 2017.
MRT-5, or the Metro Manila Subway, which runs from Mindanao Avenue in Quezon City to the Ninoy Aquino International Airport, with a target completion for the first three stations set for May 2022. Not indicated in the map are the envisioned extensions to Bulacan in the north and Cavite in the south, which were mentioned by Finance Secretary Carlos Dominguez III.
LRT-6, which runs from the tip of the LRT-1 extention in Bacoor to Dasmariñas, Cavite. Last we've heard, the prequalification process for the project was delayed in 2016. It was originally planned to start construction in 2016 and begin operations in 2021.
MRT-7, which runs from San Jose del Monte in Bulacan to the Unified Grand Central Station in North Avenue, Quezon City. Construction of the MRT-7 is now underway. The project broke ground in 2016 and is expected to be completed by 2019.
PNR Northrail, which runs from Tutuban to Clark. The first phase of this project, which covers stations from Tutuban to Malolos, Bulacan, broke ground in January 2018 and is expected to be fully operational by 2021.