We shipped the Frames via Roro. Assembled and Erected the Steel Frames on site.
It is a 5-room with Entertainment Hall Resthouse Unit.
We are using state-of-the-art, automated Structural Steel Frames for Housing Construction, Condominium and Hotel Wall Partitions, Office Structures, Etc.
12/11/2014
We shipped the Frames via Roro. Assembled and Erected the Steel Frames on site.
It is a 5-room with Entertainment Hall Resthouse Unit.
12/11/2014
We constructed a 100sqm, 2-storey house model in partnership with James Hardie Philippines, which we constructed for 10 days-20hours per day. It was constrcuted on a parking lot infront of SMX, Mall of Asia.
The House is made of Structural Steel Frames and used Hardiflex Fiber Cement Boards for the Exterior and Interior Walls.
No hollowblocks, gravels, sands and cements used for dry wall system.
12/11/2014
8-Unit Apartment
Please wait for additional photos to be posted. Thank you!
20/10/2014
Developed Subdivision with 108 units in Tagaytay last 2008.
20/10/2014
400 units were manufactured in 4 months using Structural Steel Frames Leyte.
20/10/2014
This was constructed in Baseco, Manila in 2004. We supplied and taught the affected residents how to assemble and erect their houses using Structural Steel Frames.
20/10/2014
20/10/2014
Bungalow and 2-Storey Residential Units
20/10/2014
Developed 300 units in Malay Balay, Bukidnon