05/06/2025
As part of its monitoring responsibilities, the Engineering Office—headed by the diligent Municipal Engineer Ronald Juan, under the leadership of Mayor Edward Juan—conducted site inspections of the ongoing road concreting works under the Philippine Rural Development Project (PRDP). These inspections aimed to ensure that the implementation aligns with the as-built plans and complies with the required engineering standards.
15/05/2025
Field evaluation / monitoring of the subproject Rehabilitation of Sta. Lucia - Sta. Catalina FMR with Bridge
11/02/2025
Joint Inspection of NPCO RPCO and LGU of the PRDP Scale-Up Subproject located at Sta. Lucia - Sta. Catalina
04/02/2025
Engineering team together with Vice Mayor Victor Emmanuel Callangan and Municipal Officials performed a site inspection to determine where to place the road signages. This could involve ensuring that the signs are properly located for visibility, safety, compliance with regulations, and effectiveness in guiding people or conveying the intended message.
10/01/2025
Site visiting the Community Center and School Building of Barangay San Vicente
08/01/2025
Monitoring of Sta. Lucia to Sta. Catalina FMR
30/11/2024
Today we are preparing the blue topping survey. Up next will be the ground clearing.
22/11/2024
As stake is now in progress, today is the start of the rehabilitation of Villa Miguel to Sta Catalina FMR.
19/11/2024
Groundbreaking Ceremony at Barangay Villa Miguel, Quirino,
Isabela.
25/07/2024
Inspection of completed projects conducted by the COA Regional Office - II Personnel : Sir Randolf C. Sumabat and Sir Dionelle Dhan Felipe with Municipal Engineer Ronald J. Juan and Engr. Marie Joice M. Talledo.