San Pedro City Engineering Office

San Pedro City Engineering Office

Share

The Official page of the City Engineering Office of San Pedro, Laguna

Photos from San Pedro City Engineering Office's post 09/06/2025

TRAFFIC ADVISORY

This is to inform the motoring public that the USPS Holiday Homes Bridge, will implement a stop-and-go traffic scheme on June 9, 2025 (10PM) to June 10, 2025 (2AM).

This is to give way to the "Rehabilitation of Local Bridge: USPS Holiday Homes Bridge" project of the City Engineering Office.

Photos from San Pedro City Engineering Office's post 24/04/2025

POWER INTERRUPTION ADVISORY

In line with Meralco's facility upgrading project, their team are scheduled to conduct their activity along Brgy. Poblacion and Cataquiz 5 Subdivision on APRIL 24, 2025 (THURSDAY) 11:15PM TO APRIL 25, 2025 (FRIDAY) 4:15AM.

Please be informed that the residents residing near the said site will be experiencing power interruptions within the mentioned timeframe. Also, residents with vehicles are advised to have their cars parked on ONLY ONE SIDE of the street (RIGHT LANE).

Thank you so much for your cooperation.

Photos from San Pedro City Engineering Office's post 06/03/2025

TRAFFIC ADVISORY

This is to inform the motoring public that the portion of Ramirez Ave., Brgy. Poblacion will be temporarily closed to vehicular traffic on the following dates, March 6 (1pm-5pm), March 7 (10am-3am), March 8 (9am-3pm), to give way to the "Design and Build of City Hall Annex" project of the City Engineering Office.

Photos from San Pedro City Engineering Office's post 28/02/2025

TRAFFIC ADVISORY
This is to inform the motoring public that a STOP AND GO TRAFFIC SCHEME will be implemented along Pagsanjan St., Holiday Homes, Brgy. San Antonio tomorrow, March 1, 2025 - 8 am onwards.
This is to give way to the "Road Concreting and Drainage Rehabilitation" project of the City Engineering Office.

Photos from San Pedro City Engineering Office's post 02/02/2025

TRAFFIC ADVISORY

This is to inform the motoring public that the PORTION of the entrance landmark of USPS, Brgy. San Antonio, City of San Pedro will be temporarily closed to vehicular traffic from February 3, 2025 onwards to give way to the "Construction of the Monument of Our Lady of Lourdes" project of the USPS HOA.

Photos from San Pedro City Engineering Office's post 12/01/2025

TRAFFIC ADVISORY

This is to inform the motoring public that a ONE-WAY TRAFFIC SCHEME will be implemented along Garcia St., Brgy. Nueva from January 13, 2025 ONWARDS.

This is to give way to the "Drainage Rehabilitation" project of the City Engineering Office.

07/12/2024

TRAFFIC ADVISORY

This is to inform the motoring public that a STOP AND GO TRAFFIC SCHEME will be implemented along Hernandez St., Brgy. Landayan tonight, December 7, 2024 - 11pm onwards.

This is to give way to the "Asphalt Overlay" project of the City Engineering Office.

Photos from San Pedro City Engineering Office's post 04/12/2024

TRAFFIC ADVISORY

This is to inform the motoring public that a STOP AND GO TRAFFIC SCHEME will be implemented along Hernandez St., Brgy. Landayan on December 5, 2024 - 11pm onwards.

This is to give way to the "Asphalt Overlay" project of the City Engineering Office.

Want your business to be the top-listed Government Service in San Pedro?

Click here to claim your Sponsored Listing.

Location

Website

Address


San Pedro
4023