26/05/2026
On 13 May, we had the pleasure of hosting our Data Center Communications Compliance Workshop in Kuala Lumpur, bringing together operators, consultants, and industry professionals.
During the session, we explored a critical but often overlooked issue:
π Many data centres are operating with unnoticed compliance risks.
Key takeaways from the workshop included:
β’ Why certified equipment alone does not guarantee compliance
β’ The difference between product compliance vs. system compliance
β’ Real-world interference cases and how they could have been avoided
β’ A practical MCMC compliance checklist for audits, tenders, and upgrades
What made the session truly valuable was not just the content β
but the discussions, questions, and shared experiences from the room.
Whatβs next?
Weβre continuing this workshop series across Asia-Pacific, covering:
β Design standards
β Deployment practices
β Long-term operations
If youβd like to:
β Access the full session materials
β Discuss your project
β Join upcoming events
Feel free to reach out or message us directly.
29/04/2026
π¨ Your data centre might be non-compliant.
RF issues = interference + downtime + risk
Join our KL seminar and fix it before it hits.
β Real cases
β Hidden risks
β MCMC checklist
π
13 May 2026 | 2:00β4:30 PM π Crystal Crown Hotel, Petaling Jaya β Afternoon tea included
π Save your seat
12/02/2026
Our First Indonesia Seminar βA Great Success!
Recently, EVERTAC Solutions Γ Citradata hosted our first M&E consultant seminar in Jakarta!
25 professionals joined us at Golden Hour Coffee to explore a common challenge β why radios fail in basements, stairwells, and equipment rooms β and how RFoF DAS technology solves it.
Great turnout, great conversations. Thanks to Citradata, Metakom Group, and everyone who joined!
π More seminars coming across Southeast Asia in 2026. Follow us for updates!
15/01/2026
Ultra-High-Rise Case Series
At the heart of a tier-one cityβs innovation hub,
two 320-meter twin towers stand within a 1.36M sqm mixed-use development β
integrating offices, retail, hospitality, talent living, and culture.
As people, data, and scenarios converge at scale,
how do you ensure high-capacity, low-latency wireless connectivity in a complex mixed-use environment?
15/01/2026
Certified by Guinness World Records as the worldβs largest indoor ski resort, L+SNOW Indoor Skiing Theme Resort faces extreme wireless challenges β ultra-low temperatures, high humidity, massive ice structures, and peak crowds with intensive streaming demands.
We ensured stable connectivity to support safety and emergency readiness.
07/01/2026
A large-scale theme park resort
from a world-renowned building block brand
has opened in a major global city.
Spanning 318,000 square meters,
the park includes 8 themed zones
with distributed functions and operations
across a wide area.
With high visitor density during peak periods,
ensuring stable, cross-zone communication
becomes a critical operational challenge.
How can it be achieved?