10/15/2026
π§ Cape Coral Parkway East Lane Update
Three through lanes in each direction between Coronado Parkway and Del Prado Boulevard are expected to open by October 23, weather permitting.
Paving and striping will take place overnight, between 7 p.m. and 6 a.m. At least one lane will remain open in each direction during construction.
Once the new lane configuration opens, parking will no longer be allowed on either side of Cape Coral Parkway.
Drivers should expect congestion as work continues toward the projectβs anticipated completion in November. Motorists, bicyclists and pedestrians are urged to use caution and follow posted signage.