09/03/2026
Please be advised that the town will begin road chip sealing on September 8, 2026 through September 11, 2026.
We will be working on various roads in Hunter Estates as well as in Town. Please note that any vehicle that is near the road will be subject to possible oil splash during this time.
Daily vehicles that can be moved as needed will not be affected. However, all trailers, vehicles, and other items must be removed from the street during this period to avoid being towed. During the time that the roads are being worked on there will be a time when you will not be able to drive on the road.
MESQUITE, 4TH ST, D ST, SKYLINE DR, CENTER, YUCCA, LEAH, HILL, ACACIA, SOUTH, 4TH ST E, 3RD ST, ASH, MADISON, STADIUM, PARKS CANYON, GALE, and EAST AVE.
https://duncanaz.us/wp-content/uploads/2026/09/Chip-Seal-Preparation-Letter.pdf
Thank you for your cooperation.