🪨 Look what turned up on BIA Route 6! 🪨

Crews dug up some serious boulders this week. These giants are most likely sandstone concretions. They're natural rock formations that build up over millions of years as minerals cement sand together, a little like a pearl forming. The white streaks are probably calcite filling old cracks.

North Dakota is known for these, but it's not every day you see them this big!

Thanks to the crews for their hard work moving these out of the way. 💪

⚠️ Reminder: This is an active construction zone. Please use an alternate route if you do not live on this road.

BIA Route 6 Construction Update🚧 BIA Route 6 is still closed to through traffic. Only local traffic is allowed. Please u...
10/21/2026

BIA Route 6 Construction Update

🚧 BIA Route 6 is still closed to through traffic. Only local traffic is allowed. Please use your alternate route unless you live or have business along the project.

🦺 Crews started work on the extension section today. This week will be busy, with several crews working at the same time in a 1,000-foot stretch.

What's happening:

• Pipe sections were installed today. Crews will start backfilling the side slopes on Wednesday.
• WRT will be on site Wednesday morning to relocate a fiber optic line.
• Milling starts Wednesday at 9:30 a.m., with trucks hauling material off site.
• Concrete trucks and a pump truck are tentatively scheduled Wednesday afternoon to fill an old cattle pass.
• Gravel work continues to bring the road up to grade, and proof rolling tests will start on the west end.

🚜 Paving: The asphalt plant is expected to arrive Thursday or Friday. Paving could start Friday or Saturday, depending on setup.

⚠️ Please use caution. There will be a lot of workers on foot and heavy trucks moving in and out, especially on the east end. If you have to travel through as local traffic, slow down, follow flaggers and signs, and expect delays. Thank you for your patience while we get this road built.

10/16/2026

BIA Route 6 / BIA Route 3 Construction Update

Here's where things stand over the last two weeks:

✅ Subgrade prep is complete. The dirt crews finished grading all the way to the east end of the project, despite losing time to the storm earlier this month.

✅ Two new approach culverts were installed. These were added to the design to improve drainage at driveways and field access points.

🚧 Gravel base is going down now. Crews have placed the first 4" and 2" lifts of base course. Survey checks show the grading is very accurate. The final 2" lift will go on once the contractor's GPS grading equipment arrives.

🛣️ Paving is scheduled to start around October 20, weather permitting. Paving will begin on BIA Route 3. Expect paving equipment, trucks hauling material, and possible short delays.

⛔ The road is NOT open to traffic. Please stay off the construction area. When it opens, we will post it here.

Please slow down near work zones and give crews and equipment room. Thank you for your patience. Paving is next.

09/17/2026

BIA 6: RESIDENTS ONLY — SPEED LIMIT 25 MPH

This road is NOT OPEN TO THROUGH TRAFFIC yet. Access is for residents of BIA 6 only.

If you live on this road:

Speed limit is 25 mph — no exceptions.

Road conditions are active construction. Sections are being tilled and stabilized. Soil work creates uneven surfaces and patches.

Drive with caution. What looks smooth in one section may be rough in the next.

This isn't finished product yet. Treat it accordingly.

We're grateful to share progress on the Route 6 construction project—a $20 million investment in our reservation's infra...
09/16/2026

We're grateful to share progress on the Route 6 construction project—a $20 million investment in our reservation's infrastructure and future. The crews are working hard to deliver the roads our community waited decades for.

Project Status Update:
The crews are currently in the pipe work and soil stabilization phase. Two deep-hole installations are underway, and our dirt crew is tilling and stabilizing native soils to prepare for final layering and paving. This is critical infrastructure for our people.

WE NEED YOUR HELP.

Since August, the project has experienced ongoing equipment theft, vandalism, and harassment of workers. This includes:

• Fuel and supplies stolen from equipment
• Tools damaged and removed
• Worker safety incidents (speeding near work zones, projectiles thrown at crews)
• Equipment sabotage (bleach in gas tanks, straps cut, fuel contaminated)

This is unacceptable. These actions delay our project timeline, increase costs, and put workers at risk. This is disrespectful to the investment our Tribe and our federal partners have made on this project.

IF YOU SEE SOMETHING, REPORT IT.

Contact the Sioux County Sheriff and report.
Include: Date, time, location, vehicle description, and what you witnessed.

This is our investment. This is our future. Everyone deserve safety whether they’re building the roads or traveling them.

🚧UPDATE🚧Highway 6 is now open to traffic as of 7:23 pm. Thank you for your cooperation.Please use the County Road.
09/08/2026

🚧UPDATE🚧

Highway 6 is now open to traffic as of 7:23 pm.

Thank you for your cooperation.

Please use the County Road.

09/04/2026

UNDERSTANDING GRAVEL ROAD MAINTENANCE

Washboarding is one of the most common complaints about our gravel roads. Although a grader can smooth the road, washboards can return quickly when the underlying material is not suitable for a long-lasting road surface.

WHY DO WASHBOARDS FORM?

Vehicle tires repeatedly push and bounce loose gravel into small ridges. Washboards develop faster when:

* The road is dry
* Traffic is heavy or traveling too fast
* The gravel does not contain enough fine binder
* The particles are mostly the same size and do not lock together
* The road surface is not adequately compacted
* Existing washboards are not cut to their full depth

A road may have been graded recently and still develop washboards again. This does not necessarily mean the operator failed to maintain it. It often means the existing material will not stay bound together.

NOT ALL GRAVEL IS ROAD-SURFACE GRAVEL

Good road gravel contains a properly graded mixture of larger rock, smaller rock, sand, and fine binder material.

For example:

* Gravel with too few fines stays loose and develops washboards.
* Material containing too much clay may become dusty when dry and muddy when wet.
* Gravel containing mostly one particle size does not lock together properly.
* Properly graded gravel contains different particle sizes that fit together and enough binder to hold the surface in place.

The Department is often working with locally available soils and lower-grade gravel from our pit. A grader can reshape this material, but it cannot change its quality or add the missing binder.

WHAT WOULD CREATE BETTER ROAD CONDITIONS?

Longer-lasting improvements would require:

* Testing the existing soil and gravel
* Improving or stabilizing weak soil beneath the road
* Trucking in better soil, binder, or higher-grade surface gravel
* Adding the correct amount of moisture
* Properly compacting the new material
* Maintaining an adequate crown and drainage
* Placing enough gravel to replace material lost through traffic, weather, and maintenance

For a typical 24-foot-wide road, one mile would require approximately 3,750 tons of material. That is nearly 190 truckloads if each truck carries 20 tons.

Based on current regional material, trucking, equipment, and labor costs, properly improving one mile would cost approximately:

$250,000 PER MILE

That is a general planning estimate. The cost could be lower when suitable material is nearby or higher when it must be hauled a long distance.

If the soil and road base underneath also need to be removed, stabilized, or rebuilt, the cost could reach $500,000 or more per mile.

For perspective, properly improving only 10 miles could cost approximately $2.5 million.

STAFFING ALSO AFFECTS FREQUENCY

A realistic maintenance assignment would be approximately 10 road miles per operator. Tribal Roads Operators are responsible for more than 50 + miles each. That is over five times the desired coverage, before accounting for travel, weather, equipment breakdowns, repairs, and other road-maintenance responsibilities.

Technical references: NDDOT Gravel Surfacing Specification⁠ and FHWA Gravel Roads Construction and Maintenance Guide⁠

🚧 BIA Route 6 Reconstruction Update 🚧This week the construction crews exposed what’s underneath 40+ years of patchwork r...
08/21/2026

🚧 BIA Route 6 Reconstruction Update 🚧

This week the construction crews exposed what’s underneath 40+ years of patchwork repairs—multiple layers of asphalt mill, clay pushing through weak subbase, and buried infrastructure that shows exactly why this reconstruction matters.

The history: BIA 6 was built in 1983. For the last four decades, maintenance meant temporary patches—which work short-term but don’t fix the foundation. Each patch is just a bandage.

This reconstruction is removing those layers, rebuilding the base, and doing this right. It costs more upfront and takes longer, but you won’t be back to patching this portion of road every few years.

In the coming weeks, a bigger culvert will be taken out and the road will not be open to any traffic due to the size of the cut. As we get closer to that point an update will be posted here.

We appreciate your patience as this project continues through the fall. These updates show you exactly what’s happening and why. Safe travels out there. 🚗

08/18/2026

⚠️PUBLIC SERVICE ANNOUNCEMENT⚠️

There were some supplies that went missing over the weekend from the project site on BIA 6-Porcupine cut across. If you’re driving near the construction project and notice anything suspicious, please report it right away.

Report to:

BIA Law Enforcement: (701) 854-7241
Sioux County Sheriff: (701) 854-3481

Let them know the time, location, and what you saw. Photos/videos help too.

This project has been a long time coming and is very much needed. When things go missing it slows things down and costs money to replace.

Thanks for keeping an eye out.

🚧 PUBLIC REMINDER – BIA ROUTE 6 (PORCUPINE CUT ACROSS ROAD) 🚧BIA Route 6 remains CLOSED TO THROUGH TRAFFIC until further...
08/09/2026

🚧 PUBLIC REMINDER – BIA ROUTE 6 (PORCUPINE CUT ACROSS ROAD) 🚧

BIA Route 6 remains CLOSED TO THROUGH TRAFFIC until further notice.

“LOCAL TRAFFIC ONLY” means ONLY residents who live along the section of BIA Route 6 currently under construction may use the road to access their homes.

It does NOT mean the road is open on weekends, after construction hours, when equipment is not visible, or when crews are not actively working.

If you do not live along this section of BIA Route 6, please use an alternate route.

Culvert replacement requires sections of roadway to be excavated, and open trenches and other construction hazards may be present at any time — including nights and weekends. Barricades are in place for a reason. DO NOT drive around, move, or disregard barricades or road-closed signage.

We understand the inconvenience caused by road construction. However, these improvements are necessary to address the same road conditions our communities have asked to have repaired. In order for that work to be completed safely and efficiently, the public must follow the traffic restrictions while construction is underway.

These restrictions are for the safety of the traveling public and the construction crews. Ignoring them could result in serious injury, vehicle damage, or disruption and delays to the project.

The road is NOT open to through traffic unless and until an official announcement is issued stating that it is open.

Please do not rely on word of mouth or assume the road is open because it is a weekend or crews are not visible.

We will notify the public when traffic restrictions change and when BIA Route 6 is reopened to through traffic.

Thank you for your patience and cooperation while we work to improve our roads and make them safer for our communities.

Address

Fort Yates, ND
58538

Telephone

+17018548611

Website

Alerts

Be the first to know and let us send you an email when SRST Transportation Planning & Tribal Roads posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to SRST Transportation Planning & Tribal Roads:

Shortcuts

Share