10/16/2026
๐ง Oversize/Overweight (OS/OW) Permit Holders๐ง
Oversize/Overweight (OS/OW) permit holders traveling the I-41 corridor between Grand Chute and De Pere should plan ahead for active construction zones. High-attention areas include locations with narrowed lanes, reduced shoulders, lane shifts, temporary barrier walls, active workers and equipment, and changing traffic patterns.
Loads with width, height, length, or other overhangs should use extra caution, as narrowed lanes combined with wider loads require additional preparation and attention. Review route options in advance and be aware of work zone signs, speed limits, and flagging operations.
See the latest project traffic impacts: https://i41project.wisconsindot.gov/