Several questions have been asked regarding the Wildwood Park project and I would like to share my response to those questions. As stated before this is still a proposed project.
Could you help us understand what is meant by a closed loop water system for the proposed data center?
A closed-loop cooling system continuously recirculates the same water through the cooling equipment rather than continuously using fresh water and discharging it. Fresh water is primarily added only to replace small losses from evaporation, maintenance, or periodic system flushing. A simple way to think about it is a glass of water where you only need to top off what is lost rather than continually refilling the entire glass.
How much of the 25,000 gallons of water proposed to be used per day is released back out and on what schedule?
The 25,000 gallons per day represents anticipated makeup water demand, not 25,000 gallons per day of wastewater discharge. The actual amount released would depend on the final cooling design, but would generally be only a portion of the total and may occur periodically as part of routine system flushing or maintenance.
Where and how does used water get released, and are there environmental concerns?
Any water released during routine system flushing or maintenance would typically be directed to the sanitary wastewater system and handled in accordance with Carroll County discharge requirements, rather than being released directly onto the property, into stormwater facilities, or into streams. Because the system recirculates water, water consumption and wastewater discharge are substantially lower than with once-through or more water-intensive cooling systems.
Do we have an expected decibel level at the property lines?
Final property-line noise levels will depend on the completed site layout, equipment selection, setbacks, and acoustic mitigation, so we would not want to provide a final dBA figure until the acoustical study is complete. The project will be designed to comply with the data center ordinance limits, using measures such as equipment enclosures, equipment placement and orientation, sound walls and berms, screening, setbacks, and lower-noise cooling equipment as needed.
Sincerely,
Steve Boyer
Grayson County Administrator