10/21/2026
We had to cut our way in before we could trench our way back out! 1100’ of total 1” Pex trenched and laid.
Old PVC has give this homeowner problems every winter for the last several years. Out with the old and in with the new!
If you need any trenching done, whether it’s to redo an existing line or new construction, feel free to reach out!
☎️ E&A Earthworks
270-999-8250