ROADWORK UPDATE

Marks Street Drainage Project

Contractor struck water main while excavating drainage pipe sequence. Crew on scene to fix.

Apologize for inconvenience

Big Thank you to Brianna from Rockland Fire. Crew got recertification on CPR today.
10/16/2026

Big Thank you to Brianna from Rockland Fire. Crew got recertification on CPR today.

ROADWORK Crackfilling starts today and will continue into late next week. Will be starting in Myrtle Street area today. ...
10/07/2026

ROADWORK

Crackfilling starts today and will continue into late next week.
Will be starting in Myrtle Street area today. Will be shifting to Vernon Street area after.
Next will be Central Street area.
Sides off of Concord and Summer
Millbrook and Frenches crossing
Wyman fields.
Will be adding streets dependent on time.

These are all streets within last ten years.

ROAD WORK UPDATE Tomorrow, Friday the 2nd, we will be paving the remainder  of Police Station, Drive from Market St, Rai...
10/01/2026

ROAD WORK UPDATE

Tomorrow, Friday the 2nd, we will be paving the remainder of Police Station, Drive from Market St, Rail Trail section by Liberty Street and onto Liberty Street. The Drive from Market will be pulled first and will be closed the remainder of day. Get your coffee early! Rail Trial will be pulled next and will be closed remainder of day. Liberty Street area at Market to Vernon will be closed from approximately 12-4 PM.
Seek alternate routes.
Thank you for your patience

ROAD CLOSED East Water Street at and around Number 313. Will  be closed until this evening due to a stormwater issue. De...
09/28/2026

ROAD CLOSED

East Water Street at and around Number 313. Will be closed until this evening due to a stormwater issue. Detour at Liberty/ Eastwater Street and Webster/ Eastwater Street.

ROAD CLOSURE: East Water Street at and around number 313.  Road closed at East Water and Liberty, East Water and Webster...
09/27/2026

ROAD CLOSURE:

East Water Street at and around number 313. Road closed at East Water and Liberty, East Water and Webster and all secondary approaches.
Crews will be on site to alleviate a stormwater/culvert issue.

STORM ALERT Rain by Friday Night. Duration of storm will exceed 24 hours. Watch for some wind damage and power outages o...
09/25/2026

STORM ALERT

Rain by Friday Night. Duration of storm will exceed 24 hours. Watch for some wind damage and power outages on Saturday, with the potential of poor drainage flooding with total rainfall of 2 to 3 inches and more through Saturday.
Post storm conditions: Late Monday To Tuesday partial clearing. Provided by Precision weather.

Crews are out clearing all barrels and cones and any loose items from road work sites besides what is definitely needed. Please take caution in the North Ave area, Concord and Summer area, and the Liberty Street by Market area. Signage and barrels will be placed back out post storm. Please bring in any trash and recycling totes after pickup today.

Crews will be on standby for tree and flooding issues. Be safe.

Road work uodateNorth Ave road closure, tomorrow Friday the 4th.  Approximate time 830 AM to 2PM. Union Street to Plain ...
09/03/2026

Road work uodate

North Ave road closure, tomorrow Friday the 4th. Approximate time 830 AM to 2PM. Union Street to Plain Street. Water main repair at Division Street intersection as well as ongoing drainage and paving. Thankfully no school tomorrow. Open to North Ave residents and emergency vehicles only.

Thankyou for your patience

08/22/2026

UPDATE:
Late Summer Summary:

North Ave curb and walk project phase 2:
Have just added binder coat to curb project at the section from Lancaster to Division Street. Will be confirming and signing off on all structure, Gates and curb boxes. Will add topcoat once sign offs are confirmed. We have started to pull the curb on the odd side of North ave and will be installing granite curb the beginning of next week. We will follow up with grading and asphalt binder once all structure and gates have been refurbished and/or replaced. We will continue the process on the even side once we have everything over to binder for pedestrian flow. The approximate completion date will be November.
Funds used: Complete Streets grant, Town Articles, Drainage and Highway General.

Concord Street curb and walk project from 365 Concord Street to Summer Street intersection:
Concord Meadows Development s completed their sidewalk remediation to Shaw Ave. The town will continue curb and walks rehabilitation to Summer Street intersection. The intersection will have new crossings pushed out away from Intersection format. We have stated to pull existing walk and curbing and will continue this week. Once completed the contractor will be in to install new curbing. We will follow up with Structure, curb box, and gate refurbishment. Will then install asphalt binder, confirm infrastructure upgrades and final coats. The intersection will have new crosswalks and additional signage installed.
Funds used: Developer remediation, Chapter 90, Drainage and Highway General.

Manzella Ct and Digrande Drainage project:
We will be starting drainage upgrades to this area. Will include replacing pipe sequencing, manhole rehabilitation, And catch basin rehabilitation. The work is in preparation for paving the roads in Spring 2027.
Funds Used: Chapter 90, and Drainage and Highway General.

Marks and Woodsbury Drainage project: This project will be the same scope as Manzella/Digrande area. Funding sources are the same.

Drainage/Stormwater:
Concord Street from John Dunne Drive to Market is currently being engineered for substantial drainage upgrades. This area will have new easement that runs to Calvery Chapel established drainage easement.
Funds used:
Stormwater/Drainage and Highway General.

Rice Ave from North and South Douglas to Cottonwood is currently being engineered for substantial drainage upgrades. The area will have new easements added, culver with additional and closed elements.
Funds used:
Stormwater/Drainage and Highway General.

Recycle Center Composting operations: We will continue to grind and compost all our organic products. Trying to clean up the area for future operations. Loam, Compost, Mulch and woodchips are available for Town residents.
Funds used: Town Article and Drainage and Highway General.

Highway Department paving:
The Highway Department had Substantial grading, drainage upgrades and asphalt binder installed. Looks great. will be adding topcoat next fiscal year.
Funds used: Town Article, Drainage and Highway General.

Police Station paving project:
We are getting ready to raise the castings and gates to add the topcoat to the police Station. We will also be paving the road from Market Street and the Rail Trail access road. We will be following up with new striping and signage in this area.
Funds used: Town articles, and Highway General.

We are currently finalizing the 5- and 10-year road management plan. All of the Town roads have just been inspected and evaluated on condition. We will be releasing the 5 year plan by the end of year. Obviously will be dependent on grants, Chapter 90 and Town articles.

In addition to the above projects, we will continue on weekly sweeping, drainage maintenance and brush cutbacks.

Thank you for your patience.

07/20/2026

ROAD WORK UPDATE:

AREA: Hingham Street State layout between Burger King and BMW Dealership. The State will start work tonight and the timeline is about 8-10 nights during the weeknights. 8PM-5AM approximately. Tonight (Monday) they will be milling. The rest of week they will be installing traffic loops. We have been told the paving will be done the beginning of next week. Striping will follow the pavement process. This is a MassDOT project. Seek alternate route if possible. There will be delays.

Address

841 Market Street
Rockland, MA
02370

Opening Hours

Monday 8:30am - 3:30pm
Tuesday 8:30am - 3:30pm
Wednesday 8:30am - 3:30pm
Thursday 8:30am - 3:30pm
Friday 8:30am - 3:30pm

Telephone

(781) 878-0634

Alerts

Be the first to know and let us send you an email when Rockland Highway Department posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to Rockland Highway Department:

Shortcuts

Share