Stop the CyrusOne Data Center in Sangamon County

Directions

Stop the CyrusOne Data Center in Sangamon County We are the change. 🌎👣

10/22/2026

Existing local infrastructure attracts development interest.

Regional coordination assembles the participants.

Separate bodies authorize land use, service, financing and incentives.

Construction creates assets and operating relationships.

Those relationships leave repayment duties, service expectations and continuing costs that may last through ownership changes.

          Ps.   in WHOLE! Let the people see the   roots 🙄🤯
10/16/2026



Ps. in WHOLE! Let the people see the roots 🙄🤯

MISO’s Multi-Value Projects (MVPs) are regional transmission solutions that are eligible for regional/subregional cost sharing and support one or more of the following three goals:

  Who is really shaping the future of our land, water, energy and government?Something remarkable is happening right in ...
10/13/2026



Who is really shaping the future of our land, water, energy and government?

Something remarkable is happening right in front of us. And one of the world’s largest investment firms has practically written the explanation for us.

In its 2026 infrastructure outlook, describes an investment strategy built around coordinating land, electricity, fiber, financing, regulators and developers. It calls a project in Texas a “repeatable delivery template.”

Think about what that means.

The investment opportunity goes far beyond constructing a data center. It’s about assembling everything needed to make that development possible, including access to the essential infrastructure our communities depend on.

And now look at what’s been happening right here in .

In 2022, funds managed by and acquired in a transaction valued at approximately $15 billion, including debt.

In 2024, acquired Global Infrastructure Partners, bringing that investment business into its global infrastructure platform.

That same year, helped arrange an $8 BILLION financing facility supporting ’s broader expansion.

Now follow the other side of the development.

, backed by funds managed by and , was advancing the land and power development here through .

By August 2024, Diamond Core had secured an option involving the same 280 acres of farmland later included in the application.

By February 2025, Swift was arranging introductions between CyrusOne and county zoning officials. The cooperative’s records also document discussions involving , Swift, CyrusOne and .

All before the April 2026 public zoning approval.

Now consider the role of the , also known as .

This organization brings private business and public leadership together. Our County Board Chairman Andy Van Meter and Springfield Mayor Misty Buscher sit on its board alongside leaders in banking, engineering, construction, education and other industries.

SSGA helps recruit developments, prepare sites and coordinate regional economic growth.

It also helped orchestrate a $5 million, 20-year community benefit agreement with .

And on SSGA’s own website, you’ll find ’s publicly owned water supply, electricity and fiber network being marketed as regional development assets.

Now we’re beginning to see how the pieces fit.

→ Global investors finance the development.

→ Companies assemble land and arrange infrastructure.

→ Economic-development organizations coordinate regional opportunities.

→ Government bodies make the zoning, utility, incentive and infrastructure decisions that allow projects to proceed.

And federal policy is accelerating this model. The July 2025 executive order on data centers directs agencies to streamline permitting, identify federal land and pursue financial support for qualifying projects.

Private capital is creating enormous demand, while government is being asked to reshape the conditions needed to accommodate it.

This is the significance of the relationships I’ve been documenting across , , , and .

Each county has its own records, projects and decisions. But the questions about who finances development, who prepares the infrastructure and who influences public priorities reach well beyond any one county line.

And it helps explain why our debates keep getting divided into individual controversies about data centers, solar farms, water agreements, transmission lines, fiber networks and zoning.

We’re often looking at individual pieces of a much larger economic-development system.

The impact is spreading across entire regions, while the money and influence behind these investments are increasingly concentrated.

This is what I mean when I talk about honeycombs and hives.

The individual projects are the honeycombs. The investment, development and governmental relationships connecting them are the hive.

And the most important question is whose interests are guiding the construction of that hive.

Our farmland is somebody’s investment opportunity. Our electricity is somebody’s operating requirement. Our water is somebody’s development resource.

But to us, these are the foundations of our homes, livelihoods, communities and freedom.

That’s why public leadership must answer to the people who already live here, rather than allowing private investment priorities to become our governing priorities.

Follow the money. Follow the land. Follow the authority.

And remember, the people who live here have a rightful place in deciding what gets built here.

For the People. For the Land. For the Future.

🐝 Illinois Open Field | Honeycombs & Hives

🔗 Read the records, links in comments.

By the authority vested in me as President by the Constitution and the laws of the United States of America, it is hereby ordered: Section 1. Policy and

Stop the CyrusOne Data Center in Sangamon County
10/08/2026

Stop the CyrusOne Data Center in Sangamon County

09/22/2026

🌾 Sangamon County’s data-center story began long before the zoning vote - 🔗 in comments.

Andy Van Meter’s role in this story begins with county government’s decision to organize and finance economic-development recruitment. Van Meter is Sangamon County’s Republican County Board chairman. The county dates his tenure as chairman to February 2000. His responsibilities include appointments to boards and commissions, and he serves as an ex officio member of the County Board’s standing committees.

The CyrusOne proposal eventually brought that development work to a specific place. Its application covered approximately 280 acres on Thayer Road in Talkington Township, divided among four parcels. The applicant was C1 Sangamon I LLC. On April 7, 2026, the County Board approved the conditional use 17–10, with one abstention.

That vote is one part of the history residents can examine.

Earlier records show how the county approached recruitment. Utility records document negotiations under names associated with Swift Current and Double Black Diamond. A fire-district annexation includes two of the actual project parcels. After the zoning vote, negotiations continued over who would reimburse electrical construction costs.

Read together, these records explain how a proposed development moves from an idea into commitments affecting a community.

🏛️ The county’s recruitment work came first

CONFIRMED

On October 10, 2017, consultants Craig Coil and Janet Mathis presented the County Board with a proposed economic-development organization under the working name Sangamon Success 2030.

They recommended a private nonprofit led by a private-sector board that would also include the County Board chairman and Springfield’s mayor. The stated goals included attracting investment and creating and retaining jobs.

Van Meter told the board that the next step was Finance Committee consideration. He emphasized that this required a permanent place in the county budget rather than a single year’s commitment. He also discussed having board members take the presentation into the community.

By 2019, the Springfield Sangamon Growth Alliance, commonly called SSGA, was reporting that it had identified potential locations for future data-center projects. Its annual report also described contact with more than 65 site-selection consultants.

That establishes an earlier countywide recruitment effort. It gives residents a different starting point for understanding what followed.

A site-selection consultant helps a company evaluate places to locate. When a community’s development organization prepares information for that process, it is helping prospective companies determine whether the area can meet their requirements.

A later project announcement therefore has a history behind it. The practical question is which preparations remained exploratory and which became financial, contractual or governmental commitments.

📄 The earlier project discussions used different names

CONFIRMED

On July 23, 2024, Rural Electric Convenience Cooperative’s meeting summary reported continuing discussions concerning Swift Energy’s Double Black Diamond Data Center.

On December 17, 2024, RECC’s board authorized CEO Sean Middleton to negotiate interconnection agreements with Ameren and Swift Current Energy. The summary also discussed contractual relationships involving RECC, NextEra, Ameren and MISO.

Those were discussions about the electrical arrangements needed to serve a proposed facility.

The county’s own minutes describe a parallel land-use discussion. At the November 10, 2025 meeting, planning official Trustin Harrison said zoning staff had met with Daniel Sheehan, identified in the minutes as Double Black Diamond’s project operator, about how a data center would fit the county’s ordinance. Harrison described another approach in March, followed by committee direction to develop ordinance language.

When Van Meter asked about the department’s earlier work, Harrison explained that the conditional-use approach was intended to give the county more control over what could occur on the property.

For residents following the chronology, the distinction is important. Earlier conversations involved people associated with Double Black Diamond. The eventual zoning application carried the C1 Sangamon name.

Searching only for “CyrusOne” leaves part of that history outside the search.

🚒 Two project parcels appear in a Waverly fire-district annexation

CONFIRMED

On November 10, 2025, the County Board adopted Resolution 39, annexing listed properties into the Waverly Fire Protection District. The resolution was included in a group adopted using the board’s recorded 28–0 roll call.

The annexation exhibit lists 33-20.0-300-003 and 33-20.0-400-002 under JDI Farms Inc. Both parcel numbers also appear in the legal description for the C1 Sangamon zoning case. These are two of the project’s four parcels.

The ordinance explains its history through the county’s 2005 fire-protection plan, a 2006 amendment, and Waverly Fire Protection District’s formation on May 3, 2024.

Then, at the April 7, 2026 zoning meeting, CyrusOne’s representative identified Virden Fire Protection District as one of the taxing districts serving the site. He said CyrusOne had committed in writing to buying Virden a ladder truck. Waverly was among the neighboring districts discussed in connection with mutual aid.

OPEN QUESTION

How are responsibility and resources divided across the campus?

The parcel records and the hearing statements place more than one fire district in the project’s service history. A current district map overlaid with the proposed buildings would show which parts of the site fall within each boundary. The response agreements would establish how departments coordinate an emergency.

For residents, the practical issues extend beyond the purchase of a truck. They include available personnel and the training needed for this particular facility. They also include how neighboring communities remain covered when departments provide mutual aid.

Those questions are answerable through the district boundaries and written response arrangements. A community-benefit announcement supplies only part of that information.

⚡ The construction-payment arrangements continued after approval

CONFIRMED

The summer 2026 RECC summaries document continuing work on financial protections.

On June 23, directors unanimously approved a reimbursement agreement with Swift Current, conditioned on money being placed in escrow to provide prompt reimbursement of construction costs. RECC also approved ex*****on of an Ameren reimbursement agreement and a 2027 Ameren Umbrella Construction Agreement.

On July 28, directors unanimously approved ex*****on of a Swift reimbursement agreement containing a maximum for construction costs. The summary says Swift would deposit money in escrow or obtain a line of credit at ex*****on. It does not publish the maximum amount.

On August 25, Middleton reviewed a draft three-party agreement involving RECC, NextEra and CyrusOne for the Diamond Core Data Center. Directors also reviewed Swift’s reimbursement arrangement in connection with Ameren’s system-expansion guarantee. The board unanimously approved the Ameren modification and Swift reimbursement agreements pending legal review.

The status of each action matters. An authorization to execute an agreement is a recorded board decision. Evidence that the agreement was signed and its funding conditions were satisfied establishes the next step.

INFERENCE

The records show continuing roles for several companies after the CyrusOne zoning vote. Swift Current remained named in construction reimbursement. NextEra and CyrusOne appeared in the proposed three-party agreement. Ameren’s construction and service-modification instruments were being addressed alongside those arrangements.

That is why the Diamond Core name remains relevant. It continues to appear in the utility’s contractual work.

OPEN QUESTION

What financial protection was actually delivered?

The executed agreements would establish the construction-cost ceiling and the conditions for obtaining reimbursement. They would also explain responsibility for costs exceeding that ceiling or for work left unfinished if the project changes or stops.

The posted summaries establish that protections were being negotiated and authorized. They leave the final amounts and terms unresolved in the public account.

🧾 The county also authorized a review of its development spending

CONFIRMED

The same November 10, 2025 meeting included approval of a review by The Development Consortium.

Its proposal called for evaluating implementation of the earlier economic-development strategy and updating performance indicators. The proposed fee was $20,000 plus travel and other expenses. Its schedule anticipated completion by March 31, 2026, assuming contract ex*****on by December 15, 2025.

Board member Sam Cahnman asked whether the purpose was to determine whether county spending on the Growth Alliance was effective. Van Meter confirmed that purpose.

That returns the story to the county’s original recruitment decision.

The county proposed a long-term investment in organized economic development. Years later, it authorized a review of the results.

OPEN QUESTION

What did that review conclude, and when did county officials receive its findings?

The executed contract would establish the final scope and schedule. The completed report would show what was measured and what the consultant found. County responses would show how officials used the findings.

The proposed completion date alone cannot establish that a contractual deadline was missed. It does identify a specific review whose delivery and results can be accounted for.

🧭 What this teaches residents across central Illinois

INFERENCE

Sangamon’s records show that development proceeds through several decision processes at once.

The county considers permitted land uses. A cooperative negotiates electrical service and construction reimbursement. Fire districts establish responsibility for emergency response. The recruitment organization works with prospective companies while county officials decide how to fund and evaluate that work.

A zoning hearing brings these subjects into one public discussion. The underlying decisions still sit in different files.

That helps explain why our regional investigation includes municipal utilities and road departments alongside county boards. An engineering agreement or a utility commitment can identify a project’s direction before its final application appears.

Each record has to be read for what it actually authorizes. A survey is evidence of investigation. An executed easement grants rights. A reimbursement agreement assigns costs according to its terms. These are different stages with different consequences.

🐝 🐝 These records give constituents a way to evaluate the project beyond the competing claims made at a hearing.

The field is the visible location. The agreements explain how it becomes a development site, who has authority at each stage and who carries the obligations afterward.

This is a very long read because this is a very strategic and layered process.  Please read when you have time & get inv...
09/21/2026

This is a very long read because this is a very strategic and layered process. Please read when you have time & get involved.

🐝 How local decisions become part of a much larger development system

Illinois Open Field Coalition Forward | 9.21.26

Our Ady Advantage research now reaches an actual data-center recruitment project involving municipal fiber and a national operator. It gives us a documented example of how local infrastructure becomes valuable far beyond the community that built it.

That matters to our work in Sangamon County. It helps us understand what to look for in the records behind a proposed development.

One organization prepares the property information. Another determines whether electricity can be supplied. Agreements establish who may use the infrastructure and what they must pay. A company operating across the country can then acquire an opportunity that took years of local work to prepare.

Our investigation follows what happens between those steps.

⚡ Mark Lofthus connects the Ady research network to an actual recruitment project

The December 2016 Ady presentation identifies Mark Lofthus of Dakota Electric Association on its site-selector survey steering committee. That establishes his participation in the research. It does not identify him as an Ady employee.

His earlier work supplies the more substantial connection.

On June 23, 2014, Dakota Electric announced that it had helped recruit DataBank to a former bakery distribution building in Eagan, Minnesota. The announcement names Lofthus as its economic-development director. It also identifies Great River Energy as instrumental in the recruitment. Great River was Dakota Electric’s wholesale power supplier.

DataBank’s February 17, 2015 announcement explains why the location worked.

Its site decision depended substantially on AccessEagan, a city-deployed 17-mile wholesale fiber network available to broadband and telecommunications providers. DataBank also credited its electric-utility partners.

The city’s communications infrastructure was part of the reason a national data-center company chose that property.

The chronology matters. This recruitment preceded Lofthus’s appearance in the 2016 Ady research. Our record shows an experienced utility-development professional participating in a later industry study. The study did not cause the earlier project.

What it establishes is that Ady’s professional research network included someone who had already worked through the combination we are examining.

Ady presentation, PDF page 10
https://www.midamericaedc.org/media/userfiles/subsite_134/files/resources/AdyPresentation-Mid-AmericaEDC-1202-2016-vFinal.pdf

Dakota Electric’s recruitment announcement
https://www.dakotaelectric.com/2014/06/23/dakota-electric-helps-bring-data-center-to-dakota-county/

DataBank’s account of the Eagan project
https://www.databank.com/resources/press-releases/databank-eagan-venture-recognized-as-business-recruitment-project-of-the-year/

🌐 A local fiber investment became part of a national network

DataBank’s March 28, 2024 account describes the Eagan facility as MSP2. It reports serving more than 100 enterprise customers.

The facility connected with three other DataBank locations in the Minneapolis area and 13 facilities in other American metropolitan areas. The company also identified traffic exchange through the Midwest Internet Cooperative Exchange.

A municipal fiber network helped attract a facility that subsequently connected customers to a wider commercial network.

This is why our New Berlin investigation reaches beyond the number of households paying an internet bill.

Residential service is one function of a network. Its value as a connection between places is another. The Eagan record demonstrates that second function.

For New Berlin, our questions concern what the proposed sale actually included. Was the purchaser seeking subscriber revenue? Did the offering include village-owned equipment? Which connections depended on agreements with another company?

Those questions need answers from the asset schedules and service agreements. A residential customer list would not tell us everything about the infrastructure being offered.

We also need to know what the village could operate independently. A system may work as a whole while particular components depend on rights held by someone else. The documents should identify those dependencies before the public is asked to evaluate a transfer.

Eagan shows why those questions matter. New Berlin’s own records must supply the answers.

DataBank’s description of MSP2’s wider connectivity
https://www.databank.com/resources/blogs/databanks-minneapolis-carrier-hotel-data-center-the-easy-alternative-for-carrier-selection-and-low-latency-performance/

🔌 Two Minnesota recruitment efforts meet through the same wholesale supplier

Our Minnesota findings have another documented connection.

Connexus Energy commissioned Ady’s Anoka County recruitment roadmap. Its target-industry analysis recommended smaller data centers where fiber was available. Electricity infrastructure was identified as an advantage.

Dakota Electric’s Eagan recruitment involved Great River Energy.

Great River also had a documented ownership-and-supply relationship with Connexus.

Its August 30, 2022 announcement describes approved agreements changing Connexus from a member-owner to a customer effective January 1, 2023. Those agreements extend through 2045. Great River would continue transmission responsibilities and coordinate power-supply needs through a joint operating committee.

These recruitment efforts meet in a real electricity-supply system. Their connection extends beyond similar language in development reports.

This helps explain why the county map is only one map we follow. A wholesale supplier’s responsibilities can connect development efforts in otherwise separate communities.

The same question applies to RECC’s upstream arrangements.

In September 2025, RECC’s board approved a five-year extension of its Full Requirement Supply Agreement with NextEra. That is a recorded contractual decision beyond the earlier minutes documenting project discussions.

The Minnesota agreements do not tell us what RECC’s agreement requires. They demonstrate why an upstream supply contract belongs in a local development investigation.

Minnesota’s Connexus Energy remains separate from the Illinois Conxxus/Metro fiber inquiry. The names alone establish no ownership connection.

Anoka County packet containing the Ady study
https://anokacountymn.gov/Archive/ViewFile/Item/4131

Great River–Connexus agreement announcement
https://greatriverenergy.com/company-news/membership-approves-customer-arrangement-with-connexus-energy/

RECC’s 2025 minutes
https://www.recc.coop/wp-content/uploads/2026/01/2025-Board-Minute-Summaries.pdf

📖 Sangamon’s coordinating role is written into the public contract

Our Salina comparison becomes more useful beside Sangamon County Contract 399.

Ady’s 2018 Salina implementation map recommends agreements between development partners. It calls for a protocol to handle prospective businesses and preparation of property that is not ready for sale. A later section recommends a digital-ambassador program.

These were recommendations within the same deliverable. The implementation map alone does not establish which recommendations were carried out.

In Sangamon, the Program of Work attached to Contract 399 places infrastructure evaluation alongside recruitment and marketing. It describes governmental coordination through a “one-stop-shop” approach. Working councils would involve local and regional leaders.

The relationship among these subjects is part of the assignment the county funded.

There is also a named local forum to examine.

The Greater Springfield Chamber of Commerce says its Development Policy Council meets monthly. Participants include government representatives and developers. SSGA and Chamber members also participate.

Its stated mission is to streamline permitting and zoning challenges within Springfield.

That identifies a place where development procedures are discussed. It does not establish that the council holds zoning authority or handled the unincorporated CyrusOne site.

Our next comparison is between recommendations made in such a forum and the public actions that followed. Meeting material can identify who proposed a change. The government’s record can establish whether it was adopted.

Salina’s implementation map
https://salinaedo.org/wp-content/uploads/2018/05/Salina-Implementation-Map.pdf

Signed Contract 399, including the Program of Work on page 4
https://contracts.sangamonil.gov/cm/displayContractImage.action?contractNumber=399

Springfield’s Development Policy Council
https://www.gscc.org/development-policy-council/

🌾 Our land-rights records belong beside the public agreements

Our existing private-land research becomes more relevant as the institutional history comes into focus.

The preserved signature page for Logan County instrument 201900104807 identifies VM4 Family, L.P. as owner. VM3, Inc. acts as its general partner.

Andy Van Meter signs as president, with a June 10, 2019 acknowledgment. The preserved instrument identifies Whitney Hill Wind Power, LLC as the project-rights recipient and Matt Birchby as the project-side signatory.

Enel’s December 30, 2019 company release confirms that Swift Current Energy developed Whitney Hill and HillTopper.

Separately, Van Meter and Dan Dungan appear on the signed county–SSGA agreement. SSGA’s November 2019 announcement identifies Dungan as board chair during the Ady engagement.

Those records establish different roles in different transactions. Together they give us a specific chronological question.

Which private interests remained active when later public actions occurred?

The Whitney Hill agreement needs to be followed through any amendments and assignments. Its compensation provision needs to be compared with payment records. Relevant disclosures should be examined against the dates of public participation.

The signatures establish authority to execute the documents. They do not establish Van Meter’s ownership percentage or personal receipt of compensation.

Our work is to follow the documented interest far enough to determine its actual terms and duration.

Enel’s release confirming Swift’s development role
https://www.globenewswire.com/news-release/2019/12/30/1965009/0/en/enel-starts-operations-at-two-renewable-energy-plants-in-the-u-s.html

County Contract 399
https://contracts.sangamonil.gov/cm/displayContractImage.action?contractNumber=399

SSGA’s announcement identifying the Ady engagement and Dungan’s role
https://www.thriveinspi.org/News/1/New-Name-New-Brand-for-Local-Economic-Development-Group/news-detail/

🏗️ CyrusOne’s Texas projects explain what a prepared site can become

The Texas records help us ask more precise questions about the Swift–Diamond Core–C1 sequence.

On November 3, 2025, Calpine and CyrusOne announced an additional 210 MW for the Thad Hill Energy Center project in Bosque County. Combined with the earlier 190 MW agreement, that brought the announced arrangement to 400 MW.

The release describes securing power and a grid connection together with land. It calls the offering Powered Land Capabilities.

On February 9, 2026, Constellation announced that its Calpine business had signed another 380 MW agreement with CyrusOne at Freestone Energy Center. A separate exclusive arrangement covered an additional potential 380 MW phase.

These are different contractual stages. They should not be counted as completed operating capacity.

The commercial offering extends beyond acreage. It includes arrangements that make a large electrical load possible.

That is the question we are applying to the Sangamon handoff.

Did the later applicant obtain the right to rely on an earlier utility study? Were reimbursement obligations transferred? Which agreements required consent before another entity could use them?

A land transfer would answer who acquired an interest in the property. It would not necessarily answer what happened to the earlier development work.

The actual Sangamon transaction documents must establish those terms. CyrusOne’s Texas announcements demonstrate that bundled arrangements are part of its business. They do not establish identical terms in Illinois.

There is a further named connection. Swift’s April 30, 2025 Double Black Diamond announcement identifies Constellation in the supply arrangement serving Chicago and other customers. Constellation’s later Calpine announcement identifies its role in CyrusOne’s Texas project.

Those are separate commercial relationships involving the same corporate group.

CyrusOne’s expanded Bosque County agreement
https://www.cyrusone.com/resources/press-releases/calpine-and-cyrusone-announce-phase-2-of-powered-land-agreement-to-support-hyperscale-data-center-at-thad-hill-energy-center-in-texas

The Freestone agreement
https://www.cyrusone.com/resources/press-releases/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas

Swift’s Double Black Diamond announcement
https://swiftcurrentenergy.com/swift-current-energy-announces-energization-of-landmark-800-mw-solar-facility-in-illinois-with-american-made-equipment/

💼 The wider investment relationships have identifiable dates

On July 22, 2025, Buckeye announced that it had distributed its majority ownership stake in Swift Current Energy to funds managed by IFM Investors. Swift would operate as a standalone company.

Swift’s July 30, 2025 board announcement named Neil Doherty and Remy Verot of IFM Investors among its directors. It also identified Matt Birchby on that board.

That supplies a dated governance connection in addition to the ownership announcement.

On the data-center side, CyrusOne’s SEC-filed announcement records completion of its acquisition by funds managed by KKR and Global Infrastructure Partners on March 25, 2022.

The companies appearing in our local development history sit within larger investment structures.

That does not establish that every investor reviewed every local document. It identifies another level where transaction approvals and financing records may reside.

The local file may tell us who applied for zoning. A corporate record may tell us who authorized an acquisition. Those are different questions about the same developing opportunity.

NextEra provides another specific example of international reach.

On August 12, 2026, it announced definitive agreements with the U.S. Department of Commerce and the Government of Japan to fund development and operation of up to 10 GW of gas-powered generation in Texas and Pennsylvania. The announcement says those projects remain subject to permitting and development requirements.

That is an international arrangement involving the corporate group named in RECC’s supply record. The published agreement concerns Texas and Pennsylvania. It supplies no evidence that Japanese funding entered the Sangamon project.

Our investigation must keep a company’s wider business reach separate from the source of money for a particular local transaction.

Buckeye’s Swift ownership-transfer announcement
https://www.buckeye.com/press-releases/buckeye-energy-holdings-spins-out-its-ownership-interest-in-swift-current-energy-to-funds-managed-by-ifm-investors

Swift’s July 2025 board announcement
https://swiftcurrentenergy.com/swift-current-energy-welcomes-three-new-board-members/

CyrusOne’s acquisition announcement filed with the SEC
https://www.sec.gov/Archives/edgar/data/1553023/000110465922038090/tm229713d1_ex99-1.htm

NextEra’s U.S.–Japan agreement announcement
https://newsroom.nexteraenergy.com/2026-08-12-NextEra-Energy%2C-U-S-Department-of-Commerce-and-Government-of-Japan-finalize-commercial-terms-reach-funding-milestone-for-up-to-10-GW-of-gas-powered-generation

🧭 Eagan also shows that recruitment history does not settle later public decisions

There is an important development in the same city that recruited DataBank.

Eagan’s published account says its council adopted an interim ordinance on February 17, 2026. It restricts new data centers within 500 feet of homes or using more than 20 MW through February 17, 2027, unless lifted earlier.

The city describes a study of infrastructure impacts and resource use. Previously approved facilities are treated separately.

This matters to our comparison. The city’s account distinguishes the scale of a newer generation of facilities from its existing ones.

A community’s earlier recruitment effort does not establish how it will respond to every later proposal. Each public decision has to be examined through its own record.

Eagan’s account of the interim ordinance
https://cityofeagan.com/eagan-establishes-data-center-moratorium

🌱 What our fuller record now supports

Our honeycomb is a map of overlapping systems whose boundaries do not line up.

A municipal fiber project can matter to a national operator. A local cooperative depends on upstream arrangements. A developer’s ownership can change while the opportunity it prepared continues toward a public hearing.

The records above establish examples of those relationships.

For Sangamon, that means following what was prepared and what was transferred as closely as we follow the final zoning application.

The Ady file can establish the recommendations. The county agreement establishes funded responsibilities. Utility contracts should identify the conditions for service. The transaction documents must then show which rights moved to the later project company and which obligations stayed behind.

For New Berlin, our question concerns the infrastructure created with public resources. What could the village operate or transfer independently? What remained dependent on another company’s permission or service?

For the private-land branch, we need to determine how long the signed interest continued. For the investment branch, we need to identify who authorized and financed the particular transaction.

A development opportunity can be assembled across several institutions before residents encounter it as one proposed project.

That is what our wider research helps explain. Determining what the public received requires following the agreements through to their performance.

Our neighbors experience these decisions in one place. The records are spread across many.

Our work brings them back together so the community can see what was committed and which choices still remain.

🐝