10/03/2026
VDOT work this week in Spotsylvania County:
Route 1 Northbound and Southbound
Sunday – Saturday, 8 p.m.-6 a.m. Pavement marking between South Roxbury Mill Road and the Ni River bridge.
Route 1 Northbound and Southbound
Sunday – Thursday, 8 p.m.-5 a.m. Alternating northbound and southbound lane closures between Crossing Court and Market Street for construction of I-95 exit 126 area improvements.
Route 1
Monday - Friday, 9 a.m.-3 p.m. Alternating lane closures for paving under permit between Mudd Tavern Road and Arcadia Road for Kalahari Resorts & Conventions.
Route 1 Southbound
Monday – Friday, 9 a.m.-3 p.m. Single lane closure on Route 1 southbound between Massaponax Church Road and Mudd Tavern Road/Morris Road for fiber installation under permit.
Route 3
Sunday – Friday, 8 p.m.-6 a.m. Mobile operation to mill and pave between Wilderness Road and Black Meadow Road, along with mill and pave between Ely's Ford Road and Montpelier Drive.
Route 3 Westbound
Monday – Friday, 8 a.m.-noon. Right lane closure between Taskforce Drive and Chewing Lane for construction.
Route 17
Monday – Friday, 9 a.m.-3 p.m. Traffic shift and shoulder closures between Hospital Boulevard and Massaponax Church Road for road construction under permit.
Route 17
Sunday – Friday, 9 p.m.-5 a.m. and Monday – Friday, 9 a.m.-3:30 p.m. Guardrail work near Massaponax Church Road and Old Dominion Parkway, with a flagging crew directing traffic through the work zone.
Route 208 (Lake Anna Parkway)
Sunday – Saturday, 8 p.m.-6 a.m. and 9 a.m.-3:30 p.m. Mobile alternating lane closures along various spots on Route 208 for pavement marking.
Route 208 (Courthouse Road)
Monday – Friday, 9 a.m.-3:30 p.m. Guardrail work near Hunters Lodge with flagging crew directing traffic through the work zone.
Route 605 (Marye Road)
Monday – Friday, 8:30 a.m.-7 p.m. Pavement marking. Flagging crew will direct alternating one-way traffic through the work zone between Partlow Road and Saddlebrooke Drive.
Route 606 (Post Oak Road)
Monday – Friday, 8:30 a.m.-7 p.m. Installation of pavement markers. Flagging crew will direct alternating one-way traffic through the work zone between Lanes Corner Road and Old Courthouse Road.
Route 608 (Massaponax Church Road)
Monday – Friday, 9 a.m.-3 p.m. One-way, alternating traffic directed by a flagging crew between Flippo Drive and Summit Crossing Road. Road construction under permit.
Route 738 (Partlow Road)
Monday – Friday, 8:30 a.m.-7 p.m. Paving. Flagging crew will direct alternating one-way traffic through the work zone between Route 606 (Morris Road) and Gatewood Road.
Route 2120 (Salem Fields Boulevard)
Monday – Friday, 9 a.m.-7 p.m. Paving and pavement markings. Flagging crew will direct alternating one-way traffic through the work zone between Gordon Road and Rappahannock Drive.
Route 2121 (Rappahannock Drive)
Monday – Friday, 9 a.m.-7 p.m. Pavement marking. Flagging crew will direct alternating one-way traffic through the work zone between Smith Station Road and Gordon Road.
I-95
Exit 126 (Spotsylvania) to Exit 133 (Falmouth/Warrenton)
Sunday - Monday, 10 p.m.-4:30 a.m., Monday-Thursday, 8 p.m.-4:30 a.m., and Thursday - Friday, 7 p.m.-7 a.m. Varying single lane and interstate shoulder closures. Crews will be gathering soil samples between mile markers 124 and 134.
Exit 126 (Spotsylvania)
Sunday – Thursday, 8 p.m.-7 a.m. and Friday – Saturday, 9 p.m.-6 a.m. Varying single and double lane closures near the interchange for noise barrier installation. Single lane closure begins at 8 p.m. with a double lane closure starting at 10 p.m. All southbound lanes will reopen by 7 a.m. except on Saturday, when all lanes will reopen at 6 a.m.