Wisconsin I-94 East-West Project

Directions Website

Wisconsin I-94 East-West Project Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Wisconsin I-94 East-West Project, Government Organization, 141 NW Barstow Street, Waukesha, WI.

The Wisconsin Department of Transportation
(WisDOT) will rebuild I-94 between 70th Street and 16th Street in Milwaukee County to replace aging infrastructure and improve safety
through modernized design and reduced congestion.

âšľ Congratulations to the Milwaukee Brewers  on their World Series win! We will be keeping all ramps at General Mitchell ...
10/29/2026

âšľ Congratulations to the Milwaukee Brewers on their World Series win! We will be keeping all ramps at General Mitchell Boulevard open for traffic shuttling to and from the parade tomorrow. Following the weekend, the I-94 eastbound exit to General Mitchell Boulevard and the General Mitchell Boulevard entrance to I-94 westbound will close long-term by 5 a.m. Monday, November 2 through spring 2027. âšľ

âšľ Headed to a Brewers watch party tonight or tomorrow? All ramps at General Mitchell Boulevard will be open and availabl...
10/26/2026

âšľ Headed to a Brewers watch party tonight or tomorrow? All ramps at General Mitchell Boulevard will be open and available by 3 p.m.! Plan ahead, drive safely, and allow extra time. GO BREWERS!! âšľ

âšľ If you're headed to the World Series, all ramps at General Mitchell Boulevard will be open and available. Plan ahead, ...
10/23/2026

âšľ If you're headed to the World Series, all ramps at General Mitchell Boulevard will be open and available. Plan ahead, drive safely and allow extra time. GO BREWERS! âšľ

đźš§REMINDERđźš§The I-94 eastbound exit ramp to General Mitchell Boulevard and the General Mitchell Boulevard entrance ramp to...
10/14/2026

đźš§REMINDERđźš§

The I-94 eastbound exit ramp to General Mitchell Boulevard and the General Mitchell Boulevard entrance ramp to I-94 westbound closed this morning through late March 2027.

âšľNOTE: All General Mitchell Boulevard ramps will be open and available for use on Brewers home playoff game days. âšľ

➡️DETOURS:
For EB exit - use I-94 eastbound to WIS 175 southbound to Frederick Miller Way to General Mitchell Boulevard
For WB entrance - use Blue Mound Road to 84th Street to I-94 westbound

đź”— Stay up to date on all things I-94 East-West by visiting: https://www.94eastwest.wisconsindot.gov

đźš§ UPCOMING IMPACTS đźš§The West Leg segment is scheduled to enter its next phase of work the week of October 12. The follow...
10/06/2026

đźš§ UPCOMING IMPACTS đźš§

The West Leg segment is scheduled to enter its next phase of work the week of October 12. The following long-term closures are scheduled as part of this work:

â›” I-94 eastbound exit to General Mitchell Boulevard through spring 2027
â›” General Mitchell Boulevard entrance to I-94 westbound through spring 2027

NOTE: All General Mitchell Boulevard ramps will be open and available for use on Brewers home playoff game days. ⚾️

Please plan ahead, allow extra travel time and use caution when traveling through the work zone. đźš—

đźš§ CONSTRUCTION UPDATE đźš§Crews demolished the outer portion of the I-94 westbound bridge over 70th Street earlier this wee...
09/24/2026

đźš§ CONSTRUCTION UPDATE đźš§

Crews demolished the outer portion of the I-94 westbound bridge over 70th Street earlier this week, clearing the way for girder setting later this week.

The westbound bridge at 70th Street is the last of four bridges along the West Leg to be temporarily widened. This work is part of a larger effort to prepare the freeway for an upcoming traffic shift.ďż˝

Later this fall, the westbound I-94 lanes will be temporarily widened to accommodate both eastbound and westbound traffic on the westbound side of the freeway next spring while crews reconstruct the eastbound side.ďż˝

It’s another behind-the-scenes step that will help set the stage for the next phase of the project.

09/15/2026

đźš§ CONSTRUCTION UPDATE đźš§

Friday night marked a big milestone as crews poured the first concrete lanes of the I-94 East-West Freeway Project. About ÂĽ mile of new eastbound lanes were poured between Hawley Road and Zablocki Drive.

Concrete paving will continue this week and next as crews work toward completing the new eastbound lanes in the cemetery section.

đźš— Next up: Traffic is scheduled to shift onto the new eastbound lanes in October.

📸 PHOTO UPDATE 📸There’s been a lot of progress along eastbound I-94, in the cemetery section of the West Leg, over the p...
09/10/2026

📸 PHOTO UPDATE 📸

There’s been a lot of progress along eastbound I-94, in the cemetery section of the West Leg, over the past few months!

Crews have been busy widening the roadway, building the retaining wall along the south side of the freeway, installing storm sewer and preparing the new lanes for paving. All of the work occurred within the existing WisDOT right of way, so no graves were disturbed during construction.

NEXT UP: Concrete paving is expected to begin Friday night. Once the new pavement is ready, traffic is scheduled to switch onto the new eastbound lanes in this section in October.

🔹 LABOR DAY WORK RESTRICTIONS 🔹Entering into the holiday weekend, all freeway work will be suspended from noon today thr...
09/04/2026

🔹 LABOR DAY WORK RESTRICTIONS 🔹

Entering into the holiday weekend, all freeway work will be suspended from noon today through 6 a.m. Tuesday morning, September 8. In our freeway work zones, at least two lanes will be open in each direction, with no overnight closures scheduled.

Address

141 NW Barstow Street
Waukesha, WI
53188

Alerts

Be the first to know and let us send you an email when Wisconsin I-94 East-West Project posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share