10/13/2026
Flow Management | 2027 Water Year General Timeline
Oct. 15 – Dec. 14 | 300 CFS Baseflow
Dec. 15 – Feb. 14 | Synchronized Storm Pulse Period
Feb. 15 – Apr. 14 | Wet-Season Flood Period
Apr. 15 – Variable | Snow Melt Peak & Recession
Variable – Oct. 14 | 450 CFS Baseflow
On Sept. 24, the Trinity Management Council concurred with the recommendation of the TRRP Flow Workgroup to implement environmental flows for the 2027 Water Year, which include the winter flow project ruleset. The recommendation will be sent to representatives to the Department of Interior for final approval.
Although the river is always changing, Trinity River enthusiasts can expect Lewiston dam operations of summer baseflow (450 cfs) to continue until Oct. 15 when operations drop flows to winter baseflow (300 cfs).
To subscribe to receive Lewiston Dam change order notifications, please follow this link: http://groups.google.com/group/trinity-releases/boxsubscribe