10/22/2026
As part of the Army Corps permit requirements for stream restoration projects, the County is required to perform various baseline monitoring prior to construction, as well as 3-5 years post construction to ensure restoration design standards continue to be met. The monitoring performed can include surveys to establish floodplain connectivity, channel and bank stability assessments, biological monitoring of aquatic life, as well as terrestrial plots to determine the percent of native vegetation. This year, monitoring is being done at Mayberry within the Double Pipe Creek Watershed, which is in year-4 post restoration, Woodsyde within the Piney Run Reservoir Watershed, which is in year-5 post restoration, and Brynwood, within the Liberty Reservoir Watershed, which is in year-2 post restoration.