02/01/2026
It is not - It is with such a huge coastal city under developement called a sea reclamation projectโฑ๏ธ๐๏ธ๐๏ธ
๐๏ธ๐๏ธ๐๏ธ๐๏ธ๐๏ธ๐๏ธ๐๏ธ๐๏ธ๐๏ธ๐๏ธ๐๏ธ
(The beach is currently not vastly favorable because of the opaque color of the sea. But with [the mega land reclamation project] 3km offshore, the city will become a new destination for those who love the beach which is only 42km from downtown and with a new Metroline at the speed up to 350km/hr, it will take only around 15 minutes to the site in the near future
27/10/2025
delegation visits and works at Long Thanh International Airport Project construction siteโ๏ธ
23/10/2025
LONG THANH INTโ AIRPORT update. In 2026, most international flights to & from will be via this brand new airport which is 40km away. Key infrastructure are being upgraded immediately. The government is also planning for highway expansion, new metrolines & new roads from our directions.
29/08/2025
After 2028, the top awakening destination of is going to be - sea vibes & forest vibes within the biggest city of . Thanks to: the new Metroline which takes you only around 20โ to this beautiful destination from
FYI: ๐๐ฟ
Technical & Financial Details
โข Design Speed: maximum of 350 km/h โ over three times faster than Metro Line 1 (110 km/h). ๏ฟผ ๏ฟผ
โข Track Specifications: Standard double-track, standard gauge (1,435 mm). ๏ฟผ ๏ฟผ
โข Investment:
โข Estimated at USD 4.09 billion
โข Financing Model: Proposed under a publicโprivate partnership (PPP) โ BuildโOwnโOperate (BOO) model. Vingroup (via VinSpeed) aims to finance construction and operation, while the state handles land clearance. Financing structure included 15% equity and 85% debt. ๏ฟผ ๏ฟผ ๏ฟผ ๏ฟผ
Timeline & Implementation
โข Approval & Planning: The project is part of โs revised master plan (2021โ2030 with vision to 2050), also extended in long-term planning to 2040โ2060. ๏ฟผ ๏ฟผ ๏ฟผ ๏ฟผ
โข Progress Status: As of mid-2025, Vingroup is preparing pre-feasibility and feasibility studies; authorities aim to approve the project for inclusion under a special mechanism (Resolution 188).
Expected Construction & Completion:
โข Construction may begin early 2026, with trial operations and handover targeted by 2028. ๏ฟผ ๏ฟผ
28/08/2025
The large construction site to serve 2027 in Phu Quoc . The master plan is about 78 hectares wide, located in the south of the pearl island. The works serving located on the reclaimed land include:
- APEC multi-functional complex with a capacity of 15,000 attendees;
- APEC Park located in the center can host performances, exhibitions and community events both during and after the summit;
- More than 2km of sea frontage with promenades, squares, food courts, retail...
- An iconic tower;
Image source: SOM
-------------------
27/08/2025
Upcoming project under construction in
19/08/2025
The tallest building in has just started construction from today August 19th.
FYI: The highlight of the Downtown project is the 69-storey tower about 408 meters high, expected to become the 2nd tallest building in , after in
17/08/2025
, the biggest city, top tourism destination, and innovation hub in central of ๐ป๐ณ
16/08/2025
The coolest province in the south of . Located in the highland with 4 seasons in a day, is also known as the city of thousands of flowers, the city of mist, or the so-called the miniature Paris.
๏ฟผIt is a top destination for the local who are tired of the hot tropical weather and seeking for such a romantic place.
๏ฟผBelow is a luxurious project under construction right at the peaceful central Lake in the city, surrounded by a beautiful golf course and natureโฆ
13/08/2025
Long Thanh Intโ update. Ready for 2026 to replace in terms of international flights. ๏ฟผ
07/07/2025
The view at market with cityโs first (Metroline No.1) from a walking distance. Itโs a good idea to take this to travel around, especially to area - the so-called Expat hub with lots of interesting activities awaiting for you.
01/07/2025
The new airport of update
1. Key Features
A. ๐ณ๐๐๐ ๐ป๐๐๐๐ ๐ฐ๐๐๐๐๐๐๐๐๐๐๐๐ ๐จ๐๐๐๐๐๐:
โข ๐๐ฎ๐ซ๐ฉ๐จ๐ฌ๐: ๐๐๐ฅ๐ข๐๐ฏ๐ ๐๐จ๐ง๐ ๐๐ฌ๐ญ๐ข๐จ๐ง ๐๐ญ ๐๐๐ง ๐๐จ๐ง ๐๐ก๐๐ญ & ๐ก๐๐ง๐๐ฅ๐ ๐๐ฎ๐ญ๐ฎ๐ซ๐ ๐๐ฏ๐ข๐๐ญ๐ข๐จ๐ง ๐๐๐ฆ๐๐ง๐.
โข ๐๐ก๐๐ฌ๐ ๐ (๐๐ฒ ๐๐๐๐):
โ ๐ ๐ซ๐ฎ๐ง๐ฐ๐๐ฒ, ๐ ๐ญ๐๐ซ๐ฆ๐ข๐ง๐๐ฅ, ๐๐๐ฉ๐๐๐ข๐ญ๐ฒ ๐จ๐ ๐๐ ๐ฆ๐ข๐ฅ๐ฅ๐ข๐จ๐ง ๐ฉ๐๐ฌ๐ฌ๐๐ง๐ ๐๐ซ๐ฌ ๐๐ง๐ง๐ฎ๐๐ฅ๐ฅ๐ฒ.
โข ๐
๐ฎ๐ญ๐ฎ๐ซ๐ (๐๐ฒ ๐๐๐๐): ๐
๐ฎ๐ฅ๐ฅ๐ฒ ๐๐ฑ๐ฉ๐๐ง๐๐๐ ๐ญ๐จ ๐๐๐ ๐ฆ๐ข๐ฅ๐ฅ๐ข๐จ๐ง ๐ฉ๐๐ฌ๐ฌ๐๐ง๐ ๐๐ซ๐ฌ & ๐ ๐ฆ๐ข๐ฅ๐ฅ๐ข๐จ๐ง ๐ญ๐จ๐ง๐ฌ ๐จ๐ ๐๐๐ซ๐ ๐จ ๐๐ง๐ง๐ฎ๐๐ฅ๐ฅ๐ฒ.
โข ๐๐ญ๐ซ๐๐ญ๐๐ ๐ข๐ ๐๐ฆ๐ฉ๐จ๐ซ๐ญ๐๐ง๐๐:
โ ๐๐จ๐ฌ๐ข๐ญ๐ข๐จ๐ง๐๐ ๐๐ฌ ๐ ๐๐จ๐ฎ๐ญ๐ก๐๐๐ฌ๐ญ ๐๐ฌ๐ข๐๐ง ๐๐ฏ๐ข๐๐ญ๐ข๐จ๐ง ๐ก๐ฎ๐.
โ ๐๐๐ฌ๐ข๐ ๐ง๐๐ ๐๐จ๐ซ ๐ฅ๐๐ซ๐ ๐ ๐๐ข๐ซ๐๐ซ๐๐๐ญ ๐๐ง๐ ๐ฅ๐จ๐ง๐ -๐ก๐๐ฎ๐ฅ ๐ข๐ง๐ญ๐๐ซ๐ง๐๐ญ๐ข๐จ๐ง๐๐ฅ ๐๐ฅ๐ข๐ ๐ก๐ญ๐ฌ.
B. ๐ป๐๐ ๐บ๐๐ ๐ต๐๐๐ ๐ฐ๐๐๐๐๐๐๐๐๐๐๐๐ ๐จ๐๐๐๐๐๐:
โข ๐๐๐ฟ๐ฟ๐ฒ๐ป๐ ๐ฅ๐ผ๐น๐ฒ: ๐ฉ๐ถ๐ฒ๐๐ป๐ฎ๐บ'๐ ๐ฏ๐๐๐ถ๐ฒ๐๐ ๐ฎ๐ถ๐ฟ๐ฝ๐ผ๐ฟ๐.
โข ๐๐ต๐ฎ๐น๐น๐ฒ๐ป๐ด๐ฒ๐:
โ ๐ข๐ฝ๐ฒ๐ฟ๐ฎ๐๐ฒ๐ ๐ฎ๐ ๐ผ๐๐ฒ๐ฟ ๐ญ๐ฑ๐ฌ% ๐ผ๐ณ ๐ถ๐๐ ๐ฑ๐ฒ๐๐ถ๐ด๐ป ๐ฐ๐ฎ๐ฝ๐ฎ๐ฐ๐ถ๐๐.
โ ๐๐ฎ๐ป๐ฑ๐น๐ผ๐ฐ๐ธ๐ฒ๐ฑ ๐๐ถ๐๐ต ๐น๐ถ๐บ๐ถ๐๐ฒ๐ฑ ๐ฟ๐ผ๐ผ๐บ ๐ณ๐ผ๐ฟ ๐ฒ๐
๐ฝ๐ฎ๐ป๐๐ถ๐ผ๐ป.
โข ๐๐๐๐๐ฟ๐ฒ ๐ฅ๐ผ๐น๐ฒ: ๐๐ผ๐ฐ๐๐ ๐ผ๐ป ๐ฑ๐ผ๐บ๐ฒ๐๐๐ถ๐ฐ ๐ฎ๐ป๐ฑ ๐๐ต๐ผ๐ฟ๐-๐ต๐ฎ๐๐น ๐ฟ๐ฒ๐ด๐ถ๐ผ๐ป๐ฎ๐น ๐ณ๐น๐ถ๐ด๐ต๐๐, ๐๐ฒ๐ฐ๐ผ๐ป๐ฑ๐ฎ๐ฟ๐ ๐ฎ๐ถ๐ฟ๐ฝ๐ผ๐ฟ๐ ๐ณ๐ผ๐ฟ ๐๐๐ ๐.