PROJECT UPDATE - OCTOBER 2026
The countdown to opening is on!
With the official opening of the Denise Spencer Aquatic Centre just weeks away on Saturday 12 December, October has been another busy month onsite as the project moves through its final stages of construction, finishing and commissioning.
The focus is now shifting from major construction works to the finishing touches that will bring the entire facility together.
What's Happened This Month
October has seen significant progress across the facility, including:
🏊 Pools and waterplay: Completion of the 25m indoor pool's Myrtha liner and splash pad LifeFloor installation, with pool preparation and commissioning works progressing.
🏗️ Landscaping and outdoor areas: Installation of shade sails, laying of turf, completion of site fencing and continued construction of external pathways.
🛠️ Buildings and amenities: Internal fit-out nearing completion, including painting, flooring, joinery and final finishes throughout the facility.
🔌 Services and infrastructure: Continued electrical, plumbing and data installation, with power now connected across the facility to support commissioning.
What's next?
November will see the final stages of construction and commissioning, including:
🌴 Completion of external pathways, pavement works and landscaping.
đź§ą Final internal fit-out and finishing works.
🏊 Filling, testing and commissioning of the swimming pools.
🪑 Installation of furniture, equipment and final facility preparations ahead of opening.
Spotlight Moment – Paving the Way to Opening! 🧱
With the opening of the Denise Spencer Aquatic Centre just weeks away, work is progressing on one of the final pieces of the facility — the main entrance that will soon welcome visitors through its doors!
But there's more to this entrance than meets the eye.
Back in the early stages of the project, we shared some of the engineering challenges associated with Roma's reactive clay soils, including the need to carefully manage areas where buildings supported by deep foundations meet surrounding natural ground.
The main entrance is one of these important transition zones.
Rather than relying on a continuous concrete surface, paving is being installed in these areas to provide greater flexibility in managing potential ground movement over time.
Therefore, if ground movement is encountered, individual pavers can be lifted, the bedding material adjusted and the surface re-levelled, rather than seeing large sections of concrete damaged and requiring demolition and replacement.
It's a relatively simple solution to a complex challenge, helping Council maintain safe, accessible pathways while protecting the surrounding structures.
As the finishing touches come together, it's exciting to see the entrance taking shape — ready to welcome the community into their new aquatic centre on 12 December!