31/10/2026
Well thats the 2026 running season over, with the Warcop Village Halloween ghost walk special train running last night . Now the winter maintenance jobs will become priority .Work will continue in the yard at Warcop carrying on with the new storage siding installation. We now have the missing point chairs and long timber point sleepers which were delivered last Friday. There is the south side running line upgrade to complete. There is some spot re-sleepering to do down the running line. A shunt of the rolling stock was done today and this allowed our Hunslet Shunter to have a run out over the full length of the line to Southfields and back, the first time its traversed the full running line. Please see photos of the Hunslet at the limit of our running line at our boundary with Railway Paths Limited track beyond going all the way to Appleby .