10/11/2026
BENECO POWER SERVICE ADVISORY
Scheduled Power Interruption
DATE: Wednesday, November 11, 2026
TIME: 9:00 AM to 05:00 PM
PURPOSE AND AREAS AFFECTED:
1. Primary line extension and Load Splitting
-Baguio City: Parts of Pinsao Proper (Binen, Pi***la Tam- awan)
2. Facilitate load splitting.
-Baguio City: Parts of Dontogan (Parts of Sto. Tomas Rd, Aurello St.)
3. Installation of intermediate pole to correct long-span secondary lines and Facilitate load splitting.
-La Trinidad: Parts of Calgo St., parts of Pico Road, Chinese Village entrance, Toyong, Puguis.
4. Rerouting of primary lines affected by the proposed construction of the SNAP switchyard
-Itogon: Binga (Marian Village and Riverside), Tinongdan
5. Restructuring of primary and secondary assemblies affected by ongoing building construction.
- Itogon: Parts of Loacan ( Parts of Luneta, Antamok)
6. Relocation of a secondary pole located within private property and affected by ongoing house renovation.
- Itogon: Parts of Tuding (Parts of Western Slide)
7. Installation of continuous neutral and replacement of undersized primary poles.
- Tuba: part of Camp 6 (Sitio Basa, Demo mines Road)
NOTE: The original post for the notice was published on November 06, 2026. This serves as an on-the-day reminder.
LINK: https://drive.google.com/file/d/1cEvcQftx-XquJ1oD9RV0w07JRa_1JszN/view?usp=sharing
Please consider all lines energized at all times. The power interruption may commence and be restored any time between the scheduled time. Thank you for your patience and usual cooperation.