10/30/2026
🚧 Camp Street
Our contractor, Erie Blacktop, resurfaced Camp Street this week between Monroe St. and Frantz St.
Striping and other finishing work will be occurring over the coming weeks. Please be extra attentive when traveling down this stretch of Camp Street as there is currently not any striping on the roadway.
In addition to resurfacing, the Camp Street Resurfacing and Reconstruction Paving Project included roadway and sidewalk repairs, as well as new sidewalk curb ramps along Camp from Monroe to Frantz. This project completes the resurfacing of the entire stretch of Camp Street from Washington St. to Perkins Ave, which has taken place piece by piece over the past few years.
Find more info at https://www.cityofsandusky.com/CampStreet