09/09/2026
🚧 Road Work Update
We finally received our 24,000 lbs. of calcium chloride. We have treated Calderwood Neck, Brown’s Head Light Road, and the Poor Farm, which also received its final grading for the season. We will treat roads as we grade and repair them.
We are continuing to remove nuisance rocks from the roadways. Once that work is completed, we will tar-patch all of those areas, along with other areas that are in need of repair.
The next several weeks of focus will be roadside tree trimming, tar patching, additional culvert replacements, end-of-season gravel road grading, mixing winter sand and putting it away in preparation for winter, and undercoating trucks and equipment (done twice a year).
Please remember when you see work in or near the roadway, slow down and help keep everyone safe.
Thank you.