11/06/2026
❄️Part 2 of the Snow & Ice Control Plan: Snow Route Responsibilities❄️
When it comes to "state roads" in Lexington, who's responsible? To sum it up:
- LFUCG will pre-treat and plow state roads inside New Circle Road. (Appendix A, page 30)
- The Kentucky Transportation Cabinet will pre-treat and plow state roads outside of New Circle, including New Circle itself. (Appendix A, page 30)
- Red River Ranch, an external contractor, will pre-treat and plow Man o’ War Boulevard, part of Alumni Drive, Polo Club Boulevard and Clays Mill Road. (Appendix C.9, page 42)
- There are eight urban areas, each with four routes. One driver is assigned per route, so 32 drivers per shift.
- There are two rural areas, each with two routes. One driver is assigned per route, so four drivers per shift
- Area 9 is our contractor route, and they will have six trucks and drivers per shift.
Swipe through the slides to see the specific roads and find the maps starting on page 29 of the City of Lexington, Ky - Government Snow & Ice Control Plan PDFâť„
đź”—Read the Snow & Ice Control Plan: https://bit.ly/3WNRo5C